Fin Maverick
Foundations VocabularyAccounting & ReportingEconomics & MacroQuant Methods & ProgrammingBusiness & Company AnalysisCorporate Finance & ValuationBehavioural Finance
Banking & Market InfrastructureFixed Income & RatesDerivatives & Structured ProductsPublic EquitiesTransactions & DealsPortfolio ConstructionFunds & AMCs
Private Markets & AlternativesRisk, Treasury & ControlAI & Digital FinanceStochastic Calculus & PricingWealth & Personal FinanceIndian Markets & RegulationProfessional Practice
CalculatorComparison
Frameworks
Explore Bootcamps
Equity ResearchPortfolio ManagementMutual Fund MasteryFinancial LiteracyInvestment Banking Analyst
Private Equity AnalystHedge Funds AnalystBreaking Into VCBreaking Into QuantsAI For Finance
Financial Analyst ProgramRisk Management ProgramPrivate Wealth ManagementDebt Capital MarketsDerivatives Foundation
Explore Internships
Equity Research InternMutual Fund Intern
Portfolio Management InternFinancial Literacy Intern
Explore Micro Courses

Equity Research6

Writing an Investment ThesisBuilding a Discounted Cash FlowReading an Annual Report FastReading a Sector Before a CompanySpotting Quality of Earnings Red FlagsBuilding a Revenue Forecast From Drivers

Portfolio Management3

Rebalancing: When, Why and What It CostsStrategic and Tactical Asset AllocationMeasuring Risk in a Portfolio

Mutual Fund Mastery3

Comparing Funds Without Being FooledHow a NAV Is Struck and Which Day You GetReading a Fund Factsheet Properly

Derivatives Unlocked4

Hedging a Real ExposureThe Greeks, PracticallyFutures, the Basis and What Moves ItReading an Option Payoff

AI For Finance2

Retrieval and Grounding for FinanceDocument Extraction in Finance

Breaking Into Quants4

Backtesting a StrategyHypothesis TestingCleaning Financial DataRegression for Finance

Breaking Into VC3

Sizing a MarketReading a Term Sheet as a FounderHow a Venture Round Actually Works

Financial Analyst Program4

Common Size and Trend AnalysisReading a Cash Flow StatementRatio Analysis That Says SomethingBuilding a Working Capital Schedule

Risk Management Program2

Credit Exposure and How It Is ReducedValue at Risk and What It Hides

Investment Banking Analyst3

Precedent Transactions and Why They DifferReading a Term Sheet StructurallyBuilding a Comparable Companies Table

Private Wealth Management3

Tax Aware Portfolio DecisionsBuilding a Client Risk ProfileGoal Based Planning Arithmetic

Debt Capital Markets3

Analysing an Issuer's CreditDuration and What It Does Not Tell YouBond Pricing and Yield Mechanics

Private Equity Analyst2

Fund Waterfalls and CarryThe LBO in Structure

Hedge Funds Analyst2

Short Selling MechanicsLong Short Mechanics
Courses
Explore Career Roadmaps
Investment Banking AnalystEquity Research AnalystVC AnalystPrivate Equity AnalystHedge Funds Analyst
Quant AnalystAI For FinanceFinancial Analyst ProgramPrivate Wealth ManagementDebt Capital Markets
Risk Management ProgramDerivatives FoundationPortfolio ManagementMutual Fund Mastery
PartnershipsShowdown
Log inSign up
Private Equity Analyst · CoreTrack
1Corporate Finance & Valuation
iCorporate Finance Fundamentals
Corporate FinanceCorporate Finance vs AccountingAgency CostsThe Financial ObjectiveThe Financing DecisionThe Investment DecisionProfit Maximisation vs Value…How Capital Allocation Affects…
iiTime Value of Money
Time Value of MoneyTime Value of MoneyCompoundingNominal and Effective Annual RatesThe Discount RateNominal vs Real Discount RateAnnuity vs Perpetuity
iiiCash Flow and Value Drivers
ReinvestmentReinvestment RateRevenue GrowthRevenue Growth vs ReinvestmentReturns in Corporate FinanceValue DriversOperating MarginEconomic ProfitFCFF vs FCFEHow to Normalise Earnings…
ivCost of Capital
The Cost of CapitalCost of CapitalSunk Cost vs Opportunity CostHow to Estimate a…Levered and Unlevered BetaCountry Risk PremiumEquity Risk PremiumThe Risk-Free Rate
vCapital Structure
Capital StructureHow to Analyse a…Financial LeverageOperating Leverage vs Financial…RecapitalisationDebt FinancingDebt CapacityGross Debt vs Net DebtEquity FinancingHow Leverage Can Increase…Refinancing RiskFinancial Distress
viCapital Budgeting
Capital BudgetingSunk CostsDiscounted PaybackPayback vs Discounted PaybackNet Present ValueInternal Rate of ReturnProject AppraisalIndependent vs Mutually Exclusive…How to Resolve NPV and IRR Conflicts
viiWorking Capital Finance
Capital RationingWorking Capital FinancingExcess CashCash ManagementShort-Term Financing
viiiPayout Policy
Payout PolicyPayout and Return of CapitalDividendsDividend Yield vs Payout RatioSignallingShare BuybacksDividend vs Buyback
ixValuation Fundamentals
ValuationValuation RangeFCFF vs FCFE ValuationSOTP vs Consolidated ValuationHow to Build a DCF ValuationHow to Build a…How to Build a…Firm Value and Equity ValueReplacement CostShareholder ValueEnterprise-to-Equity Value BridgeSum-of-the-PartsEnterprise Value vs Equity ValueValue vs PriceAsset Value vs Earnings ValueBook Value vs Adjusted Book ValueLiquidation Value vs Going-Concern…
xDiscounted Cash Flow
Discounted Cash FlowTerminal ValueNormalisationThe Forecast HorizonIncremental Cash FlowFree Cash Flow to FirmDiscounted Cash FlowBase Case vs Bull Case vs Bear CaseTwo-Stage vs Three-Stage DCFForward vs Historical FinancialsOperating vs Non-Operating AssetHow to Forecast Free Cash FlowHow to Audit a DCF Model
xiRelative Valuation
Relative ValuationDCF vs Relative ValuationConglomerate DiscountComparable Company AnalysisHow to Select Comparable CompaniesTrading MultiplesTrading Multiples
xiiTransaction Valuation
Transaction ValueDeal Value vs Enterprise ValueSources and UsesAccretion and DilutionHow to Analyse Accretion…Leveraged BuyoutManagement RolloverMinority Interest in ValuationControl Premium vs Minority DiscountPrecedent TransactionsLBO ReturnsTrading Comps vs Precedent TransactionsStrategic Buyer vs Financial BuyerHow to Build an…
xiiiValuation Discipline
Decision Rules in ValuationHow Valuation Ranges Improve…Implied AssumptionsImplied GrowthBase, Bull and BearScenario vs Sensitivity AnalysisMargin of SafetyHow to Check Discount…
2Transactions & Corporate Finance
iCapital Raising
Private PlacementRights Issue or Private PlacementSecondary SalePrimary Issue or Secondary SaleRefinancingConvertible Securities in a RaiseNet DebtUse of ProceedsAccretion Or DilutionHow To Analyse Financing…How To Map The…
iiMergers and Acquisitions
SynergyAsset Purchase or Share PurchaseExchange Ratio or Purchase PriceThe Deal RationaleDeal TermsIntegrationThe Integration PlanThe Value Creation PlanThe Synergy RegisterSynergy or Cost SavingThe Post-Merger ReviewMerger or AcquisitionReinvestment or Acquisition Spend
iiiThe Transaction Process, Governance and Communications
What a Transaction Is,…Signing and ClosingThe Term SheetTerm Sheet or Definitive AgreementThe MandateThe Data RoomThe Letter of IntentMaterial Information in a DealMaterial or Confidential InformationThe Deal Communication PlanInvestor or Employee MessageThe LeakThe Deal TeamThe Independent CommitteeHow an Information Barrier…Market SoundingThe Deal Stakeholder MapThe Deal TimelineDeal Outcome or Process QualityHow to Map a…The Long-Stop DateDeal RumoursDue Diligence or AuditConstruction Risk or Operating RiskRegulatory Approval or Third-Party ConsentExclusivity or ConfidentialityConditions Precedent or Subsequent
ivTransaction Documentation
Representations and WarrantiesThe Definitive AgreementThe Disclosure ScheduleThe Non-CompeteBreak Fee, Reverse Break…Termination RightsIndemnity, Covenant and UndertakingLimitation of LiabilityCompletion Accounts vs Locked BoxIndemnity vs EscrowHoldback vs EscrowHow to Build a…
vTransaction Valuation
ConsiderationBuilding a Consideration AnalysisComparable Companies in a DealEnterprise Value in a DealEquity ValuePurchase Price MechanicsThe Reservation PriceThe Fairness OpinionTransaction Risk and Integration RiskConflict of Interest and…Transaction Announcement and Market RumourBuilding a Diligence Workplan…Framing a Valuation Inside a TransactionKeeping a Transaction Decision…Writing a Transaction Case Study
viDeal Execution
Deal CertaintyConditions Precedent, Regulatory and…Deal Narrative vs Investment CaseThe Closing ChecklistMaterial Adverse ChangeClosing Deliverables
viiRestructuring
RestructuringHow to Map a…Demerger, Spin-Off and Carve-OutInsolvencyThe Distressed SaleThe Asset SaleThe Scheme of ArrangementThe TurnaroundDemerger vs Spin-OffTurnaround vs Debt Restructuring
viiiProject Finance
Project FinanceProject Finance vs Corporate FinanceHow to Map a…How to Review Project-Finance…The Project LenderSponsor vs LenderThe ConcessionDebt Service, the Cover…Debt Capacity and Debt OutstandingThe Offtake AgreementPolitical RiskHow to Build a…The Special Purpose VehicleCoverage RatiosDSCR and Interest Coverage
ixCapital Allocation
Capital AllocationHow to Build a…Growth Capex and Maintenance CapexThe Capital BudgetReturn of CapitalDebt Repayment or Share Repurchase
3Private Markets & Alternative Investments
iPrivate Markets Foundations
The Private FundHedge Fund vs Mutual FundHow to map a…How to distinguish a…Category I, II and III AIFs ComparedAlternative Investment FundPrivate MarketsPrivate Markets vs Public MarketsPrivate Equity vs Venture CapitalPrivate Credit vs Public CreditLong-Short vs Market NeutralHow to map Private Credit SeniorityHow to read a…How to map a…How to read a…How to map Private-Market Exit RoutesClawbackIlliquidityPreferred ReturnNAV Financing vs Preferred EquityFund RegistrationMultiple on Invested CapitalBuyout vs Growth EquityManagement Fee vs Carried InterestNAV vs Fair ValueNAV Financing vs Continuation VehicleGP vs LPHow to trace a…How to map a Fund LifecycleHow to read a…
iiPrivate Fund Structure and Governance
Limited PartnerThe Limited PartnershipPlacement MemorandumCommitment, Call and Capital AccountCapital CallCarried InterestHow Conflicts of Interest…Fund AdministratorFund SponsorKey-Person ProvisionsGeneral PartnerHow Limited-Partner Advisory Committees…Side LettersThe Waterfall
iiiFund Lifecycle
Fund Formation and TermRealisation and DistributionInvestment Period and Harvest PeriodDistributionFundraisingFinal CloseFund TermPrivate Fund Return MultiplesVintage BenchmarkVintage YearPublic Market EquivalentThe J-CurveRealised Value, Unrealised Value…MOIC vs IRR
ivPrivate Equity
Private EquityBuyoutGrowth EquityPortfolio CompanyBoard Observer
vVenture Capital
Venture CapitalSeed RoundVenture Capital Fund, Angel,…Series ASeries BThe Cap Table
viPrivate Credit
The Private Credit StackDistressed DebtWorkoutSecurity PackagePIK InterestPreferred EquitySyndicated LoansSenior DebtDirect LendingLeverage Ratios in Private Credit
viiReal Assets
Real AssetsBrownfield InfrastructureGreenfield and Brownfield InfrastructurePrivate Real Estate FundsREIT vs InvIT vs…Infrastructure FundsOccupancyThe Real Asset Risk SpectrumReal-Asset Cash Flow vs…Leases in Real AssetsNet Operating Income
viiiHedge Funds
Hedge FundsGetting Out of a Hedge FundPrime BrokerRedemption WindowSide PocketTail Risk in AlternativesGlobal MacroManaged FuturesMarket NeutralRelative ValueShort SellingHow Long-Short Strategies WorkEvent-Driven StrategiesArbitrageExposure and Leverage
ixDue Diligence and Private Fund Reporting
Private Fund NAVThe Investor LetterDue DiligenceInvestment Due Diligence vs…Fund AuditValuation AgentValuation LagLook-Through ReportingHow Private-Fund Reporting Can…The Quarterly Report
xExits
Strategic and Financial BuyersExitNAV FinancingContinuation VehicleContinuation Vehicle vs Traditional…IPO as an Exit RouteSecondary TransactionsStrategic SaleStrategic Sale vs Secondary Sale vs IPO

The Value Creation Plan: What Changes After Ownership Changes

A value creation plan sets out what will be different about the acquired business under its new owner and what each change is worth: price, cost, capital tied up, capacity used, what gets sold and what gets stopped. Synergy is one part of it. The rest is improvement the business could in principle have made alone, so the plan has to say why it did not.

There is a habit worth breaking at the outset. When a purchase completes, almost everybody in the building starts talking about what the two businesses can do together, and almost nobody asks the duller question underneath it: what has to be true for the money to have been worth committing at all. The two are not the same question. The first has a comfortable answer and the second usually has an uncomfortable one, and the discipline of a value creation plan is that it requires the second to be written down before the first is enjoyed.

Everything below runs on one invented purchase. Harivansh Packaging Limited trades on both Indian exchanges and makes packaging, rigid and flexible, for customers in food and in personal care. Harivansh Packaging has bought Sundarban Polymers Private Limited outright, an unlisted producer of flexible packaging films. The enterprise valueThe value of a whole business taken as one thing, before it is split between the people who lent to it and the people who hold its shares. It is the figure a purchase price is usually quoted against. of the transaction was Rs 1,320 crore. Take away the Rs 180 crore of net debtBorrowings less the cash sitting against them. It is what a business would still owe if it emptied its bank account into its lenders tomorrow morning. that Sundarban Polymers carries, and the equity value reaching the sellers for their shares was Rs 1,140 crore. The Rs 1,140 crore is what the buyer handed over and what the sellers received; Rs 1,320 crore is not the price paid to anybody.

Two people carry the decisions below. Devyani Kulkarni holds the chief financial officer role at Harivansh Packaging Limited, and the transaction team answers to Ashwin Rege.

What is a value creation plan, and where does the synergy plan sit inside it?

The narrower document is easier to define once the wider one exists, so start with the wider one. A value creation plan is a written statement of every way in which the acquired business will be different under its new owner, with an amount against each difference and a date by which it lands. Prices that will move. Costs that will come out. Cash that will stop sitting in stock and in unpaid invoices. Machines that will run more of the time. Product lines that will be stopped. Spending that will not happen. Each of those is a line, each line has a number, and each number has somebody answerable for it.

A synergy plan is a subset of the value creation plan. The synergy plan covers only the changes that require both businesses to sit under one owner and could not have happened otherwise. One purchase conversation with a supplier both businesses buy from. One set of accounts payable staff instead of two. A customer that one business could never serve alone because it lacked a grade of film the other one makes. A synergy plan covers what is only possible because two businesses now share an owner, and a value creation plan covers everything that will be different, most of which does not need the combination at all.

One document sits inside the other Everything that will be different, and the smaller set that needed the purchase to be possible at all THE VALUE CREATION PLAN: everything that will be different Collect receivables in fewer days Stop the two grades that lose money Raise price on an under-priced grade Run the third machine on a second shift Defer the line nobody has costed Clear the slow-moving stock THE SYNERGY PLAN only what needs both businesses under one owner One buying conversation One payables team A grade neither could sell on its own The test is one question: could this have happened without the purchase? If yes, it is outside the green box. Being outside the green box does not make a line worthless. It makes it a line somebody has to explain.
The synergy plan is a region inside the value creation plan rather than a separate document, so every line outside the green box is a change that did not need the purchase and therefore has to carry its own explanation.

Now the part that matters, and it is not a definitional nicety. The wider document is the more honest one, and it forces somebody to say why an available improvement had not already been taken. Consider what it means for a line to sit outside the green box. The change did not need the purchase. The previous owners could have made it. And if the line is real, the business just bought was worth more than its previous owners realised, and the buyer paid a price which already assumed it was not.

Here is the everyday version. A household buys a small shop from a retiring owner. The buyer looks at it and sees three obvious things: the shutters open two hours later than the offices nearby need, half the shelf space is given to a line that barely sells, and nobody has ever asked the wholesaler for a better rate on the one item that moves in volume. All three are improvements. None of the three needed a change of owner. So the honest question the buyer has to answer is not whether the improvements are real. The question is why the retiring owner, who knew this shop far better than the buyer does, had not made them. Sometimes there is a very good answer. Sometimes the answer is that the buyer has not yet found the reason.

So a plan built only of synergy lines is a smaller and safer document to write, and also a much less useful one. Every synergy line comes with its own justification built in: it was impossible before and it is possible now, and the reason is the purchase. Every value creation line outside that region has to supply its own reason, and a plan with a lot of unreasoned lines is a plan that has quietly assumed the previous owners were not paying attention.

Try it out

Sundarban Polymers earns 19.6 per cent on its capital employed. Is that a good outcome for Harivansh Packaging?

Try it out

A plan line says Sundarban Polymers will collect its receivables faster. Is that synergy or value creation?

Investment Banking Analyst Bootcamp — Fin Maverick

What are the levers, and which of them can a new owner actually move?

Every value creation plan ever written pulls on the same six levers, and anybody who has read one has read the list. Price, what the business charges. Cost, what it pays to produce. Working capitalThe cash tied up in stock and in invoices customers have not yet paid, less the invoices the business has not yet paid. It is money the business has bought but cannot spend., the cash sitting in stock and in unpaid invoices. Capacity used, how much of the day the machines are actually running. Capital spending discipline, what does not get built. And what to stop doing, the only lever that removes rather than improves.

Because every plan pulls the same six levers, the list carries no information at all and the sorting carries all of it. Two plans naming the identical six levers can be wildly different documents, and the difference is entirely in which levers the new owner can genuinely move and which ones require the same people who were already there to now do what they had not previously done.

Three of the six are a decision. Stopping something is a decision: somebody who now holds the shares can decide on a Tuesday that two loss-making grades will not be made after the quarter ends, and it is done, subject to the practicalities of telling the customers. Capital spending is a decision: the line nobody has properly costed can be deferred by refusing to sign for it. Working capital is close to a decision, because how much stock a business keeps and how firmly it chases its invoices are set by policies, and policies are changed by whoever sets them.

The other three are not decisions. Each of the three is an outcome of work done by people. Cost comes out because somebody renegotiates, redesigns or reorganises, and that somebody is usually a person who was already employed by the acquired business. Capacity used rises because scheduling, changeovers and maintenance all get better, which is a craft rather than an instruction. And price is the hardest of the lot, because price is the one lever that requires a customer to agree.

The same six levers, sorted by who has to act Every plan names all six. The sort below is the only thing that separates one plan from another. A NEW OWNER CAN DECIDE THESE One meeting, whoever now holds the shares What to stop doing The only lever that removes rather than improves Capital spending Moved by refusing to sign, not by doing anything Working capital Set by policies, and policies have an author THESE NEED THE SAME PEOPLE To now do what they had not been doing before Cost Somebody renegotiates, redesigns or reorganises Capacity used Scheduling and changeovers are a craft, not an order Price The only lever a customer has to agree to A plan that puts most of its amount in the right panel is asking for behaviour, not making a decision.
All six levers appear on every plan, so the sort is the content: three can be settled by whoever now holds the shares and three depend on the same people changing what they do, and a plan loading its amount into the second group is asking for behaviour rather than deciding anything.

Use the sort as a reading tool rather than a scoring system. The sort does not say the right-hand panel is impossible, and a great deal of real value has come out of exactly those three levers. The sort says something narrower and more useful: the levers in the right-hand panel take longer, they can be refused by people who do not report to the buyer, and a plan that puts most of its amount there has to explain how it will get the behaviour it is assuming. A plan that puts most of its amount in the left panel is making a decision, and decisions arrive on the date somebody writes down.

Which denominator is the plan being judged on?

The denominator is the whole of it, and it turns on a distinction so ordinary that it slides past almost everybody. Return on capital employedA profit figure divided by the money tied up in the business that produced it. Return on capital employed is defined and computed where that measure is set out, and is borrowed here ready-made. is a ratio, and like every ratio it has a top and a bottom. The top is a profit figure. The bottom is a quantity of money. Everything below is about which quantity of money.

A business measures itself against the capital on its own books. Net worth at Sundarban Polymers stands at Rs 320 crore and its net debt at Rs 180 crore, which puts capital employedNet worth plus net debt: the total money currently tied up in a business from both its shareholders and its lenders. It is a bookkeeping quantity, not a market one. at Rs 500 crore. Its earnings before interest and tax (EBIT)The profit a business makes from trading, before anything is paid to lenders or to the tax authorities, so it is compared against money from both. is Rs 98 crore. Rs 98 crore over Rs 500 crore is 19.6 per cent, and that is a genuinely good number. Harivansh Packaging's own equivalent, Rs 339 crore of EBIT over capital employed of Rs 2,390 crore, is 14.1841 per cent. By the measure each business applies to itself, Sundarban Polymers is the better of the two, and it is not close.

Now change the bottom of the ratio. Harivansh Packaging did not acquire Sundarban Polymers by putting Rs 500 crore into it. Harivansh Packaging committed Rs 1,320 crore to the business, being the Rs 1,140 crore that reached the sellers plus the Rs 180 crore of Sundarban Polymers' own net debt that came across with the shares. Both amounts belong in the denominator for the same reason EBIT belongs in the numerator: EBIT is earned before any interest is paid, so it is the profit available to lenders and shareholders together, and the money it is measured against has to be the money from lenders and shareholders together too. Rs 98 crore over Rs 1,320 crore is 7.42 per cent.

The same Rs 98 crore, two different bottoms Nothing about the earnings changes between these two rows. Only the money they are set against. ON ITS OWN BOOKS: Rs 500 crore of capital employed Rs 500 cr Rs 98 crore of EBIT on that is 19.6 per cent ON THE MONEY COMMITTED: Rs 1,320 crore Rs 500 cr Rs 820 crore of goodwill Rs 98 crore of EBIT on that is 7.42 per cent 0 Rs 400 cr Rs 800 cr Rs 1,200 cr The red block is the whole of the difference. It is what it cost to have this business today rather than build it. The bottom of the ratio is 2.64 times larger, and 19.6 divided by 2.64 is 7.42. That is the entire arithmetic.
Both rows carry the identical Rs 98 crore of earnings, so the fall from 19.6 per cent to 7.42 per cent is produced entirely by the Rs 820 crore of goodwill that widens the second bar, which is what having the business today rather than building it cost.

The Rs 820 crore reconciles from two directions, which is worth doing because it confirms that the two denominators are describing the same thing. Route one: Rs 1,140 crore reached the sellers against net worth of Rs 320 crore, so Rs 820 crore of goodwillThe excess of what was paid over the accounting value of what was acquired. How it is allocated and carried afterwards belongs to the accounting layer and is not settled here. arises before any allocation to identified intangibles. Route two: Rs 1,320 crore of money committed against Rs 500 crore of capital employed leaves the same Rs 820 crore. The two routes agree because Rs 500 crore is simply Rs 320 crore of net worth plus the Rs 180 crore of net debt that the Rs 1,320 crore also contains.

Turn that round once more and it becomes uncomfortable in a useful way. Of the Rs 1,320 crore committed, 62.1 per cent bought nothing that appears anywhere on Sundarban Polymers' balance sheet. The money bought the fact that the business already exists, already sells to those customers, already runs those machines and already employs the people who know how. A business that already exists is a real thing to have bought, and it is frequently worth buying. The same money is also money on which somebody now has to earn a return, and it does not show up as an asset a plan can improve.

The two denominators are different, and mixing them produces a comparison that flatters or damns the wrong thing. Nothing about 19.6 per cent is false. Nothing about 7.42 per cent is false. The two figures answer different questions. The first asks how efficiently this business converts the money already sitting in it into trading profit, and that is a question about the business as an operating machine. The second asks how efficiently the buyer converted money it had into trading profit it did not previously have, and that is a question about a decision. A plan can be built against either. A plan cannot be built against one denominator and reported against the other.

So the practical instruction is blunt. The plan has to state which denominator it is being judged on before its first number is written, and it has to say so on every sheet of the document. Not in an appendix, not in a footnote on the methodology slide. The reason for the repetition is that plans get extracted from, and a single table lifted out of a plan and pasted into a board pack carries no basis with it unless the basis is written on the table.

Try it out

Which denominator should a value creation plan be judged on?

How much has to change before the purchase earns what the buyer already earns?

Set a standard first, because a requirement without a standard is just a number somebody liked. The most defensible standard available here is the buyer's own return: Harivansh Packaging already earns 14.1841 per cent on the capital in its existing business, so the money it committed to Sundarban Polymers ought at minimum to work as hard as the money already working inside it. No authority hands that standard down. The buyer's own return is simply the least arbitrary benchmark on the table, and it is the one alternative use of the money that is actually known.

Apply it. To earn 14.1841 per cent on Rs 1,320 crore, the acquired business would have to produce Rs 187.23 crore of EBIT. The business produces Rs 98 crore today. The plan therefore has to add Rs 89.23 crore of EBIT, and that is very nearly a doubling of what Sundarban Polymers earns from trading today. The required figure is 1.91 times what it earns now.

The rounding here is load bearing, and it is worth thirty seconds. The record prints Harivansh Packaging's return as 14.2 per cent, which is correct to one decimal. Using 14.2 per cent, the requirement comes out at Rs 187.44 crore rather than Rs 187.23 crore, a difference of Rs 0.21 crore that arrives from nowhere except the rounding. Here it is small. Where a rounded percentage gets multiplied by a large base, the error stops being small, and the general rule is the one that matters: derive from the unrounded value and print the rounded one, never the reverse.

Running the identical standard through the other denominator shows most cleanly why the denominator has to be fixed first. To earn 14.1841 per cent on the Rs 500 crore of book capital, Sundarban Polymers would need Rs 70.92 crore of EBIT. Sundarban Polymers already makes Rs 98 crore, so on that reading it cleared the buyer's own standard before the purchase completed and the plan has nothing to do at all. One standard, one business, one set of earnings, and the requirement reads as Rs 70.92 crore against one bottom and Rs 187.23 crore against the other, with nothing else changed. The Rs 116.31 crore between those two requirements is not an accident of arithmetic: it is 14.1841 per cent of the Rs 820 crore of goodwill, which is precisely the money that appears in one denominator and not the other.

What the plan has to produce, drawn against what exists EBIT of the acquired business, in Rs crore Rs 187.23 crore required Today Rs 98 cr add Rs 89.23 cr 0 50 100 150 200 THE BASIS WARNING, WHICH TRAVELS WITH THIS FIGURE 14.1841 per cent is a return on BOOK capital. The Rs 187.23 crore is being asked of a PRICE-based bottom. So this is a question about what has to be earned on money committed, and it is not a matched ratio. Saying so is part of the answer. Required EBIT is 1.91 times today. Most plans never state this figure anywhere in the document.
Reaching the buyer's own 14.1841 per cent on the Rs 1,320 crore committed needs Rs 187.23 crore of EBIT against Rs 98 crore today, so the dashed extension is the Rs 89.23 crore the plan has to find, and the warning box states the basis mismatch that travels with the figure.
Say the basis out loud, every time. The 14.1841 per cent is a return on book capital and the Rs 187.23 crore is being asked of a price-based denominator. The two are not a matched ratio, and the comparison only holds when the mismatch is stated alongside it. The comparison does say something honest and useful: money the buyer already had was earning 14.1841 per cent, money the buyer committed to this purchase is earning 7.42 per cent, and closing that distance is a job of a particular size. Naming the mismatch is part of the answer rather than a caveat attached to it.

The Rs 89.23 crore is a far larger number than any synergy figure on this transaction, and most plans never state it at all. The omission is not usually dishonesty. The plan gets written by people whose job is to improve the business, and improving the business is measured against the business, so the denominator that arrives naturally is the one already on its books. Nobody chooses the wrong bottom. The wrong bottom is simply the one nearest to hand.

Try it out

What EBIT would Sundarban Polymers need to earn Harivansh Packaging's own 14.1841 per cent on the Rs 1,320 crore committed?

Play with it

Switch the denominator, and watch the same earnings change character

The line across the panel is fixed at Harivansh Packaging's own 14.1841 per cent and never moves. The bars do. Choose which money the earnings are being set against, then use the slider to hand the plan some extra EBIT and watch how much it takes to reach the line on each basis. The panel opens on the money-committed basis with nothing added, and that is exactly the worked case above: 7.42 per cent, needing Rs 187.23 crore of EBIT to reach the line.

One fixed line. Two bottoms. The same earnings. Return on the chosen money, per cent. The dashed line does not move. the buyer's own 14.1841 per cent On its own books Rs 500 cr 19.6 On the money Rs 1,320 cr committed 7.42 0 10 20 30 40 A ghosted bar is the basis not currently selected. It is drawn so the difference stays visible.
Money it is set against
Rs 1,320 cr committed
Return on that money
7.42%
EBIT needed for the line
Rs 187.23 cr
Set against the Rs 1,320 crore committed, Rs 98 crore of EBIT is a return of 7.42 per cent, which is 6.76 points short of the line. Reaching it on this money would take Rs 187.23 crore of EBIT.
Educational illustration. Switch the denominator. Rs 500 crore is Sundarban Polymers' net worth of Rs 320 crore plus its net debt of Rs 180 crore, and Rs 1,320 crore is the Rs 1,140 crore that reached the sellers plus that same Rs 180 crore coming across with the shares. A book return and a return on money committed are different measurements, shown together only to make that difference visible rather than as a matched ratio. The extra EBIT on the slider is a chosen quantity, not a forecast anybody has made.

Two things in that panel repay attention. First, with the slider left alone, clicking between the two bases leaves the earnings unchanged and moves the reading from 19.6 per cent to 7.42 per cent, the whole distinction in one click. Second, on the money-committed basis, the slider can be dragged up. The bar reaches the fixed line at Rs 89 crore of added EBIT and not before, and that is the requirement drawn rather than asserted. Then switch to the book basis with the slider still up there and watch the same earnings read as a triumph. Nothing about the business changed between those two readings.

Private Equity Analyst Bootcamp — Fin Maverick

Rs 8.67 crore or Rs 89.23 crore? Both, and they are not rivals

A second requirement is already sitting on this transaction, carried in from where synergy itself is set out, and putting the two side by side is worth doing. Holding Harivansh Packaging's earnings per shareWhat a single share earned over a period, once tax has come off the profit and the total has been spread across every share in issue. Set out where earnings per share is defined. at Rs 12.50/- after the purchase requires Rs 8.67 crore of additional earnings before interest, tax, depreciation and amortisation (EBITDA). Earning the buyer's own return on the money committed requires about Rs 89 crore of additional EBIT. The second is 10.29 times the first.

Two requirements, one scale, both correct Additional trading profit the acquired business has to produce, in Rs crore TO HOLD EARNINGS PER SHARE AT Rs 12.50/- THIS YEAR Rs 8.67 crore of extra EBITDA TO EARN THE BUYER'S OWN RETURN ON THE MONEY COMMITTED Rs 89.23 crore of extra EBIT The lower bar is 10.29 times the upper one. Neither is a mistake and neither replaces the other. 0 25 50 75 100 One asks whether this year's earnings per share holds. The other asks whether the money works as hard as the money already there.
Keeping earnings per share at Rs 12.50/- calls for Rs 8.67 crore more EBITDA, while matching the buyer's own return on the money committed calls for Rs 89.23 crore more EBIT, so the lower bar is 10.29 times the upper one and the two answer entirely different questions.

Both figures are correct, they differ by roughly ten times, and the reason is that they are answers to different questions rather than two attempts at the same one. The Rs 8.67 crore asks whether the purchase damages this year's reported earnings per share. The Rs 8.67 crore is a short-horizon accounting question, it has a definite answer, and it will be visible in the next set of results whether anybody plans for it or not. The Rs 89.23 crore asks whether the money committed was put to work as productively as the money already inside Harivansh Packaging. The Rs 89.23 crore is a question about the decision rather than about the year, it will not appear as a line in any set of accounts, and nothing forces anybody to compute it.

Which is why the smaller one gets all the attention. The smaller figure is the one that shows up. A programme sized against Rs 8.67 crore will pass its first year comfortably and never once ask the larger question. And the larger question is the one the purchase was actually a decision about.

Neither figure settles the larger question. Neither of them says whether Harivansh Packaging should have bought Sundarban Polymers. The Rs 8.67 crore concerns this year's earnings per share. The Rs 89.23 crore states what would have to change for the money to work as hard as the money already there. Whether the purchase was a good idea depends on what that same Rs 1,320 crore would have done in whatever was passed over to fund it, and on how the combined business performs over years still ahead of it. Neither of those sits in any figure here.

Try it out

Rs 8.67 crore or about Rs 89 crore. Which one is the plan's target?

Breaking Into VC Bootcamp — Fin Maverick

What if the business could have made the improvement on its own?

This is the part of the subject that gets softened almost everywhere it is written about, so here it is unsoftened. If the acquired business could have raised its own price or taken out its own cost, then it was worth more to its previous owners than they realised, and the buyer has just paid for that improvement in advance.

Walk the reasoning through slowly here, because this is a claim most readers agree with in a second and then find far harder to live with. A price rise that needed nothing from the new owner was available last year. If it was available last year and the sellers did not take it, the business was earning less than it could have. The valuation that produced Rs 1,320 crore was struck on what the business earns, and that is the lower figure. So the buyer is paying a multiple of understated earnings, and then proposing to capture the understatement as its own achievement. Some of that is genuinely available. Some of it was already handed over at completion, because a seller who knew the increase was there would have wanted paying for it, and a seller who did not know may still have been paid for it through a price set against a business that had it latent all along.

The household version again, and this one is uncomfortable in exactly the right way. Somebody buys a flat and says the rent can be raised by a fifth because the current landlord has not raised it in four years. Perhaps. But the buyer paid a price for that flat, and the price was set in a market where every other buyer could see the same rent roll and do the same arithmetic. If raising the rent were simply available, the price would already contain it. The times it does not contain it are real, and they have specific causes: the seller wanted a quiet exit, the seller had a relationship with the tenant, the seller did not have the money to do the repair that would justify the higher rent. Each of those is an answer. The point is that they are answers, and the buyer has to have one.

One question every plan line has to survive Could the previous owner have made this change without selling the business? NO YES It needed the combination, so it is synergy, and the reason it is possible now is built into the line itself. The price already contains it, unless the plan can name what the new owner brings that makes it possible. THREE ANSWERS THAT ACTUALLY WORK Capital the sellers would not commit A customer the sellers never reached A decision the sellers could not take Nothing further to argue about on this side. The purchase is the reason, and the reason is written down. A blank on the right is not a small gap. It is the line with no reason.
A line that fails the question has to name what the new owner brings, and the three chips are answers that genuinely work, so a line sitting on that side with no named reason is a line the buyer has already paid for in the price.

The honest response is not to drop those lines but to make the plan say what the new owner brings that makes each one possible now. Real answers exist and they are not exotic. Capital the sellers would not commit, because a private owner three years from a sale does not put money into a machine whose payback is five years. A customer the sellers could never reach, because the buyer already sells to that customer in another grade and can carry the new one in on an existing relationship. A decision the sellers could not take, because the business supported a household and stopping the loss-making grade meant stopping a relationship that household had held for twenty years. Each of those is a specific, checkable statement about what changed on the day the shares moved.

The assertion that the new owner is better at running things is not an answer. The assertion might be true. Being better at running things is not checkable and not specific, and the claim is the sentence that appears in the plan when nobody has done the work of finding the actual reason.

Try it out

The plan says Sundarban Polymers will raise prices by a stated amount. What should be asked before anything else?

How is a plan tested before anybody spends money on it?

Three questions, asked of every line, before a rupee moves. The three questions take an afternoon, and they are the cheapest work anybody does on a transaction.

The first: name the person who will make this change. Not the workstream, not the function, not the committee. One person, with a name, who knows that this line is theirs. A line whose answer is procurement has no owner, because procurement is a department and departments do not make decisions, people inside them do. The test is brutally effective because it is answerable in seconds and the failures are obvious. If nobody in the room can produce a name, the line is an aspiration that somebody wrote down in the hope it would attach itself to somebody later.

The second: name what it costs to make this change. Almost every improvement costs something. Raising capacity used may need a second shift, and a second shift needs supervisors, a canteen arrangement and probably a maintenance window that does not currently exist. Collecting receivables faster may need two more people chasing, or a discount for early settlement that gives away part of the gain. Stopping a grade may need a settlement with a customer under contract. A plan line with a benefit and no cost against it is a half-finished calculation, and the missing half is always in the same direction.

The third: name what would show within a year that this change is not going to happen. Asking somebody to write down in advance what their own failure will look like is the hardest of the three. The question also does the most work, and it converts a promise into something observable. If the price rise is going to land, then by month six a stated number of customers should have been approached and a stated number should have accepted. If neither of those has happened, the line is not late; it is not happening, and the plan can be corrected while there is still time to do something else with the effort.

A plan that has survived those three questions is a materially different document from one that has never been asked them, and the two are told apart at a glance. The survivor is shorter. Lines drop out under the first question because nobody will own them, under the second because the cost eats the benefit, and under the third because nobody can say what failure would look like. The plan that remains is smaller, and it is real.

The questionWhat a good answer looks likeWhat it costs to ask
Who will make this change?One named person who knows the line is theirs, not a department and not a committeeSeconds per line
What does making it cost?A rupee amount, including the shift, the discount, the settlement or the person who has to be hiredAn hour per line
What would show within a year that it will not happen?A countable event with a date, so the line can be corrected while the effort can still be movedAn hour per line
All three, on every lineA shorter plan, made of the lines that survivedOne afternoon
Financial Analyst Program Bootcamp — Fin Maverick Building a Revenue Forecast From Drivers — free micro-course from Fin Maverick

What does a plan look like when it is really a budget?

Sometimes a document arrives with the right title and is not the thing at all. The document is next year's budget with a wider date range, dressed in the language of a transaction. The tells are consistent, and all four of them are omissions rather than errors, so reading for them is more effective than checking the arithmetic.

Every line is a percentage improvement on an existing line. Margin improves by some amount, overheads improve by some amount, working capital days improve by some amount. Nothing in the document is a thing that will be done; everything is a number that will be better. A budget is built by taking the current year and adjusting it, and that is the shape of the document.

Nothing is being stopped. A search through the whole document turns up no line that removes anything. A plan that only improves has not made a decision anywhere, and stopping is the one lever a new owner can pull immediately and alone. Its complete absence shows that nobody made a choice; they made an adjustment.

The capital required appears nowhere. Improvements need money. The second shift, the two extra people chasing invoices, the settlement with the customer whose grade is being stopped. A document showing benefits with no capital beside them has, by construction, produced a return of infinity on nothing, and that is why the omission is so comfortable.

The plan reaches its total in the final year. Year one delivers a little, year two a bit more, and the number gets there in year five. The final-year total is the tell that matters most, and the reason has nothing to do with arithmetic. The reason is that a plan whose value all lands in year five has not been tested by anybody who will still be responsible in year five. The people writing it will have moved, and everybody in the room knows it while nobody says it.

A budget wearing a plan's title, and the four omissions that give it away Nothing on this sheet is arithmetically wrong. All four tells are things that are absent. VALUE CREATION PLAN, YEARS ONE TO FIVE 1 Margin, a per cent improvement on today Overheads, a per cent improvement on today Stock days, a per cent improvement on today Receivable days, a per cent improvement on today 2 Anything being stopped: no row on the sheet 3 Capital required to do any of it: no row either Every surviving row is an adjustment to a line that already exists, which is how a budget is built. 4 WHEN THE VALUE ARRIVES 45 per cent of the total lands in year five Y1 Y2 Y3 Y4 Y5 Four omissions: every line an adjustment, nothing stopped, no capital named, and the total arriving in year five.
All four tells are absences rather than mistakes, so no amount of checking the arithmetic finds them, and the tallest column is the worst of the four because a total landing in year five has not been tested by anybody who will still be answerable when it arrives.
Try it out

Every line in a document is a percentage improvement on an existing line and the total lands in year five. What is that document?

The plan that was delivered in full while the money underperformed

A plan is presented for Sundarban Polymers eighteen months after completion. The plan shows the margin improving and the working capital tightening, and taken together the lines are worth Rs 45 crore of additional EBIT, lifting the business from Rs 98 crore to Rs 143 crore. Every line is expressed against the business's own book position, and the whole plan is measured as a return on the Rs 500 crore of capital employed. On that denominator the business now earns 28.6 per cent, against 19.6 per cent when it was bought. The plan is reported as a success and, on its own terms, it is one.

Measure the same Rs 143 crore against the Rs 1,320 crore actually committed and it is 10.83 per cent, against the 14.1841 per cent Harivansh Packaging already earns on the money inside its existing business. The Rs 820 crore of goodwill has silently disappeared from the calculation, and that amount is exactly what made this a decision rather than a bookkeeping entry. Rs 45 crore covers 50.4 per cent of the Rs 89.23 crore the money needed, so a plan delivered in full and celebrated has produced just over half of what the money required.

The cost of the error is precise and it is not the missing rupees. The cost is that this plan can be delivered completely, on time and with every line ticked, and the buyer is still worse off than if it had put the same Rs 1,320 crore into the business it already had. Nobody lied and no number is wrong. One denominator went unstated, and the reporting inherited it.

The fix is one sentence and it goes at the top of the first sheet: fix the denominator before the first line is written, and print it on every sheet of the plan. Fixed at the start it costs nothing. Discovered at month eighteen it costs the credibility of every figure the programme has reported since completion.

The same delivered plan, read against two bottoms The plan adds Rs 45 crore of EBIT, taking Rs 98 crore to Rs 143 crore. Every line of it is delivered. the buyer's own 14.1841 per cent Measured on the Rs 500 cr on the books 28.6 per cent Measured on the Rs 1,320 cr committed 10.83 per cent 0 10 20 30 Rs 820 crore of goodwill absent from the upper reading entirely Deliver every line of that plan in full and the money committed still earns 10.83 per cent. Rs 45 crore covers 50.4 per cent of the Rs 89.23 crore needed. Half a requirement, reported as a whole success.
Measured on the Rs 500 crore of book capital the delivered plan clears the buyer's own line comfortably at 28.6 per cent, and measured on the Rs 1,320 crore committed the identical result is 10.83 per cent and short of it, because the Rs 820 crore of goodwill sits in one calculation and not the other.
A plan that stops nothing has decided nothing. See what the absences give away.

Who reads a value creation plan, and what do they read it for?

A lender reads the plan for the capital line and the timing, not for the total. The Rs 1,000 crore of new borrowing that part-funded this purchase sits on a facility carrying a contracted 9.0 per cent, and what the lender wants to know is whether the plan consumes cash before it produces any, and for how long. A plan that promises Rs 89 crore of improvement while quietly requiring a second shift, two hires and a customer settlement in year one is a plan that gets worse before it gets better, and the lender is exposed to the trough rather than to the peak. So the lender reads the plan from the bottom upwards, looking for what has to be spent.

An analyst covering Harivansh Packaging will never be shown the plan and has to work from the outline it casts. Only what management chose to say ever leaves the building, and the informative half is usually the half left unsaid. Was a denominator ever named? Was a figure given for what the money committed has to earn, or only for what the earnings per share will do this year? A company that talks only about the Rs 8.67 crore question has told an attentive outsider something real about which question it is managing to, and it has done so without disclosing anything.

An investor in the buyer reads it as a question about alternatives. Rs 1,320 crore was committed to this business. The same money could have gone into the existing plant, into a different purchase, into reducing borrowings, or back to shareholders. None of those alternatives appears anywhere in a value creation plan, so the plan alone can never answer whether the purchase was worth making. The plan can only say what has to change for the question to become answerable at all.

And the buyer's own board reads it for the two things a board can actually decide. A board cannot renegotiate a supply contract or run a second shift. A board can insist that the denominator is fixed and stated before the plan is written, and it can insist that every line names a person. Both are decisions that take one meeting, and both change what every later meeting is about.

The household version is the same discipline at a smaller scale. A household buys a small shop and takes a loan to do it. The improvement plan is real: open earlier, drop the dead line, negotiate the wholesale rate. But the money that has to earn its keep is not the value of the stock on the shelves. The money that has to earn its keep is the price paid for the shop plus the loan taken to buy it, and the household will feel it every month in the repayment whether or not anybody ever wrote the ratio down. The denominator problem is not a corporate abstraction; it is the difference between a business that is doing better and a purchase that was worth making.

Try it out

The value creation plan is delivered in full, every line, on time. Does that mean the purchase was worth making?

India

What is set elsewhere, and by whom

A value creation plan is an internal document and nobody outside the business has to approve it. The transaction underneath it is a different matter. Whether a listed buyer had to obtain anything before completing, and what it had to put on the public record afterwards, is set by the Securities and Exchange Board of India (SEBI), publishing at sebi.gov.in. How two companies are joined under company law, and the returns that process throws off, is a matter for the Ministry of Corporate Affairs, publishing at mca.gov.in. Finished filings surface at the exchanges: nseindia.com for the National Stock Exchange (NSE) and bseindia.com for the Bombay Stock Exchange (BSE). The two sites are addresses and nothing more.

No threshold, period, approval requirement or filing requirement is stated above. Wording of that kind gets revised, and a summary of it would go stale while still reading as though it were current. The publisher's own current text is the one that governs.

Two things are settled above: what has to change, and what the change has to be measured against. Synergy itself is set out where synergy is defined, and is used here as a region inside a wider document rather than explained again. The ordering of the first hundred days belongs to the integration plan and is taken as given. The register that tracks each promised line from a commitment through to a delivered amount is set out under the synergy register. How a return on capital is defined and computed is settled under return on capital employed and is borrowed here as a measure. The Rs 820 crore of goodwill is named as an amount and nothing more: how it is allocated across identified intangibles, and how it is carried afterwards, belongs where business combination accounting is taught. Whether the Rs 1,320 crore committed to Sundarban Polymers Private Limited was well spent is a separate question. Settled here is only what would have to change for that question to become answerable. The claim is a different and smaller one, and it is the only one the arithmetic supports.

Where the rules themselves are published

Each body below publishes the rule itself. A reader who wants the requirement rather than the worked arithmetic above goes there for it.

BodyWhat to look for thereSite
Securities and Exchange Board of IndiaWhat a listed acquirer has to obtain and what it has to disclose.sebi.gov.in
Ministry of Corporate AffairsThe company law route by which two companies combine. Read the route rather than a summary of it.mca.gov.in
NSE and BSEWhere an acquirer's filing appears once it has been made. Given for locating a document, never for what one must contain.nseindia.com, bseindia.com
The invented purchase worked aboveEach rupee amount above, worked again from the underlying record instead of reverse-engineered out of a rounded percentage.built for teaching

Harivansh Packaging Limited, Sundarban Polymers Private Limited, Devyani Kulkarni and Ashwin Rege are invented.
Educational material. Not advice on any investment, tax, budget or market position.

← PreviousNext →
Fin Maverick Micro CoursesExplore Micro Courses
Fin Maverick BootcampsExplore Bootcamps
Fin Maverick

Finance education that ends in a job, not a certificate that gathers dust. Built for young India.

LEARN
CalculatorsFrameworksComparisonsCareersShowdown
RESOURCES
All CoursesMicro CoursesBootcampsInternships
COMPANY
AboutJob openingPartnership
LEGAL
Privacy PolicyTerms & ConditionsContent LicenseReturn & Refund Policy
© 2026 FIN MAVERICK / BUILT FOR INDIA.DO FINANCE, DO NOT JUST READ ABOUT IT.