013A stock index stands at 24,000 and its annual volatility is 16%. What is a reasonable one standard deviation range for where it closes four months from now?Morgan StanleyTokyo · 2025
Try it first
What is one standard deviation of the index move over four months?
Show the worked solution
Roughly 21,800 to 26,200. Scale the 16% annual volatility by the square root of the time, not the time itself: four months is a third of a year, the square root of a third is about 0.58, and 16% times 0.58 is about 9.2%. That is about 2,217 points either side of 24,000, a band that holds the close about two times in three.
Why can you not just say where the index will close?
You cannot, and saying so is part of a good answer. The honest reply to a where-will-it-close question is a central point and a range, with the range doing most of the work. Today's level is the natural centre over a few months, since the expected drift is small next to the spread. The interviewer reported here asked a sales and trading candidate exactly this, and what they are testing is whether you can turn a volatility number into a range in your head.
Why does volatility scale with the square root of time?
Picture someone walking along a lane, taking each step forward or back at random. After four steps they are not usually four steps away; good and bad steps partly cancel, and the typical distance is about two steps, the square root of four. Price moves behave the same way: variance adds up with time, so the standard deviation grows with the square root of time. A third of a year is not a third of the annual volatility; it is the square root of a third, about 58% of it.
The relationshipσ annual volatility, 16% T time in years, 4/12 σ_T one standard deviation of the move over T What it says in wordsMultiply the annual volatility by the square root of the fraction of a year.Over four months one standard deviation is about 9.2%, so roughly two thirds of outcomes fall between about 21,800 and 26,200. Scaling the volatility by time instead of the square root of time gives a band of only 22,720 to 25,280, which is far too narrow. How do you check it, and what are you leaving out?
Check by another route. Monthly volatility is 16% over the square root of 12, about 4.6%, and four months is the square root of 4, which is 2, times that: about 9.2%. Same answer. Two standard deviations, about 19,600 to 28,400, covers roughly 95% of outcomes, and naming that wider band shows you know a one standard deviation range will be wrong a third of the time. Say the limits too: prices compound, so the upper side is slightly wider, about 21,900 to 26,300 on a log basis; the drift is ignored; and real index returns have fatter tails than a bell curve.
Where candidates lose it
The common loss is scaling linearly: a third of 16% is 5.3%, which gives a band from about 22,700 to 25,300. It sounds precise and is far too narrow, because it ignores the way ups and downs cancel.
The second loss is answering the literal question with a single number for the close. Give the centre, the range and the confidence that goes with it, then stop.
What the interviewer asks next
- What one standard deviation range would you give for one week ahead?
- Where would you get a better volatility number than the historical one?
- Why might the downside of the range be more likely to be breached than the upside?
Asked at Morgan Stanley, Sales and Trading, Tokyo, 2025 (Wall Street Oasis):
What do you think this index will close at by the end of the year (4 months from now)
046Sales grow by exactly Rs 10 lakh every month. A team forecasts next month's sales as the average of the last three months. By how much does the forecast miss, and in which direction?Corporate FP&ABusiness finance
Try it first
The trend is steady at Rs 10 lakh a month. How far off is the three-month-average forecast?
Show the worked solution
It under-forecasts by Rs 20 lakh every month. On a straight-line trend, the average of the last three months equals the middle month, so the average lags the latest month by one month. The forecast is for the following month, one more month ahead. Two months of Rs 10 lakh growth is Rs 20 lakh. For a window of n months, the miss is the monthly growth times (n + 1) / 2.
Why does an average lag behind a trend?
Think of judging how fast a child is growing by averaging her height over the last three birthdays. The average describes her at the middle birthday, not today, and certainly not next year. A moving average describes the middle of its window, so on a rising trend it always sits below the latest value and further below the next one. With months 4, 5 and 6 at 130, 140 and 150, the average is 140, the month 5 figure, while month 7 will be 160.
Sales rise Rs 10 lakh a month while the three-month average forecast runs parallel but always Rs 20 lakh below, because the average sits at the middle month and the forecast is two months ahead of it. The relationshipb the trend: growth per month, Rs 10 lakh n the number of months in the average (n + 1)/2 months between the centre of the window and the month forecast What it says in wordsOn a straight trend, a moving average forecast misses by the monthly growth times half the window plus one.What does that mean for the window you choose?
A longer window smooths noise better but lags more: a 12-month average on the same trend would miss by 10 x 6.5 = Rs 65 lakh. Moving averages trade noise against lag, so they suit flat, noisy series and fail on trending ones. The fix on a trend is to model the trend itself: add the slope back, or use a method that tracks level and slope separately, such as Holt's linear exponential smoothing. Say the limit both ways: if sales are seasonal, a three-month average also mixes high and low months, and if the trend turns, any trend-adjusted method overshoots for a while.
Where candidates lose it
The common answer is Rs 10 lakh: the forecast uses last month's level, so it is one month behind. That forgets that the average sits at the middle of the window, not at the latest month.
The other loss is saying the error is random. On a steady trend it is a bias: the same Rs 20 lakh in the same direction every month, which is exactly what a forecast review should catch.
What the interviewer asks next
- What is the miss for a six-month moving average on the same trend?
- How would you adjust the moving average to remove the bias?
- What happens to the forecast error in the month after the trend stops?
077A company has 50 sales branches. Last year its top 5 branches grew 30% against a company average of 10%. This year the same five grew 12%, while the average held at 10%. A new regional head took over those five branches in between. Did the new head cause the slowdown?Corporate FP&ABusiness finance
Try it first
What is the first thing you check before blaming the new head?
Show the worked solution
Not on this evidence: most of the drop is regression to the mean. A branch that tops the table usually had skill plus a good year. The good year does not repeat, so the same branches fall back toward the average whatever the manager does. Here only 2 points of a 20 point lead survived, so most of last year's lead was luck. Judge the head against similar branches that kept their managers, not against their own lucky year.
Why do the best performers fall back with no cause at all?
Think of a class test. The student who topped it probably knows the subject and also had a good day: the questions suited her and two guesses landed. In the next test the knowledge stays but the luck is drawn again, so her score is likely to be lower while staying above average. Any result that is part skill and part luck will, when it is extreme, usually be followed by a less extreme one. Francis Galton called this regression toward the mean when he compared the heights of parents and their children.
The five branches that grew 30% last year average 12% this year, close to the 10% company average, and the five weakest branches moved from -10.0% to 8.3% under unchanged management, because extreme results at both ends drift back toward the middle. How much of the 30% was luck?
Measure the lead, not the level. The top five were 20 points above average last year and 2 points above this year. Keeping 2 points of a 20 point lead means about a tenth of last year's outperformance was persistent, and nine tenths was noise that happened to land on those five branches. Look at the bottom of the chart as well: the weakest five rose from -10.0% to 8.3% with no new manager, which is the same drift running the other way.
The relationship\mu the company average, 10% \rho how much of a branch's lead carries into the next year; 1 means all skill, 0 all luck What it says in wordsA selected group's expected result next year is the average plus the persistent share of its lead.How would you test whether the new head made a difference?
Build a comparison. Take branches that were about as strong last year but kept their managers, and see how they grew this year. If they also fell to around 12%, the new head is doing exactly what chance predicts. If they held near 20%, the head has a real question to answer. The fair benchmark for a group picked for being extreme is a similar group picked the same way, never its own best year. The same trap sits in sales incentives, fund selection and bonus pools, where praising last year's winners and punishing last year's losers both appear to work.
Where candidates lose it
The story answer loses: a new head, then a slowdown, therefore a cause. The interviewer builds the question so the narrative is tempting and watches whether you ask how the five branches were chosen. Branches picked because they were extreme last year were always likely to look worse this year.
The opposite error also costs marks: clearing the head completely. Regression explains the direction of the move, not necessarily all of its size. The strong answer is that you cannot tell yet, followed by the comparison group that would tell you.
What the interviewer asks next
- Last year's weakest five branches were put on a performance plan and then improved. Did the plan work?
- What would make regression to the mean weaker in this data?
- How would you design the regional sales bonus knowing this?