Fin Maverick
Foundations VocabularyAccounting & ReportingEconomics & MacroQuant Methods & ProgrammingBusiness & Company AnalysisCorporate Finance & ValuationBehavioural Finance
Banking & Market InfrastructureFixed Income & RatesDerivatives & Structured ProductsPublic EquitiesTransactions & DealsPortfolio ConstructionFunds & AMCs
Private Markets & AlternativesRisk, Treasury & ControlAI & Digital FinanceStochastic Calculus & PricingWealth & Personal FinanceIndian Markets & RegulationProfessional Practice
CalculatorComparison
Frameworks
Explore Bootcamps
Equity ResearchPortfolio ManagementMutual Fund MasteryFinancial LiteracyInvestment Banking Analyst
Private Equity AnalystHedge Funds AnalystBreaking Into VCBreaking Into QuantsAI For Finance
Financial Analyst ProgramRisk Management ProgramPrivate Wealth ManagementDebt Capital MarketsDerivatives Foundation
Explore Internships
Equity Research InternMutual Fund Intern
Portfolio Management InternFinancial Literacy Intern
Explore Micro Courses

Equity Research6

Writing an Investment ThesisBuilding a Discounted Cash FlowReading an Annual Report FastReading a Sector Before a CompanySpotting Quality of Earnings Red FlagsBuilding a Revenue Forecast From Drivers

Portfolio Management3

Rebalancing: When, Why and What It CostsStrategic and Tactical Asset AllocationMeasuring Risk in a Portfolio

Mutual Fund Mastery3

Comparing Funds Without Being FooledHow a NAV Is Struck and Which Day You GetReading a Fund Factsheet Properly

Derivatives Unlocked4

Hedging a Real ExposureThe Greeks, PracticallyFutures, the Basis and What Moves ItReading an Option Payoff

AI For Finance2

Retrieval and Grounding for FinanceDocument Extraction in Finance

Breaking Into Quants4

Backtesting a StrategyHypothesis TestingCleaning Financial DataRegression for Finance

Breaking Into VC3

Sizing a MarketReading a Term Sheet as a FounderHow a Venture Round Actually Works

Financial Analyst Program4

Common Size and Trend AnalysisReading a Cash Flow StatementRatio Analysis That Says SomethingBuilding a Working Capital Schedule

Risk Management Program2

Credit Exposure and How It Is ReducedValue at Risk and What It Hides

Investment Banking Analyst3

Precedent Transactions and Why They DifferReading a Term Sheet StructurallyBuilding a Comparable Companies Table

Private Wealth Management3

Tax Aware Portfolio DecisionsBuilding a Client Risk ProfileGoal Based Planning Arithmetic

Debt Capital Markets3

Analysing an Issuer's CreditDuration and What It Does Not Tell YouBond Pricing and Yield Mechanics

Private Equity Analyst2

Fund Waterfalls and CarryThe LBO in Structure

Hedge Funds Analyst2

Short Selling MechanicsLong Short Mechanics
Courses
Explore Career Roadmaps
Investment Banking AnalystEquity Research AnalystVC AnalystPrivate Equity AnalystHedge Funds Analyst
Quant AnalystAI For FinanceFinancial Analyst ProgramPrivate Wealth ManagementDebt Capital Markets
Risk Management ProgramDerivatives FoundationPortfolio ManagementMutual Fund Mastery
PartnershipsShowdown
Log inSign up
Risk Management Program · CoreTrack
1Risk, Treasury & Financial Control
iRisk Foundations
Risk Appetite, Tolerance, Capacity…The Risk Taxonomy and UniverseRisk Register vs Risk MatrixStress TestingScenario Analysis vs Stress TestingImpact and LikelihoodLikelihoodThe Risk EventRisk Assessment
iiEnterprise Risk Management
Enterprise Risk ManagementThe Four Risk TreatmentsRisk CultureRisk MaturityRisk Monitoring
iiiRisk Governance
Risk GovernanceHow to set a…The Risk PolicyThe Risk OwnerThe Risk Committee and Its CharterThe Risk Limit FrameworkRisk EscalationHow to set a…
ivCredit and Counterparty Risk
Collateral AgreementsCollateral vs NettingProbability of DefaultExposureCounterparty ExposureConcentration Risk vs Wrong Way RiskCounterparty Risk vs Credit RiskHow to assess Counterparty ExposureHow to assess Concentration Risk
vMarket Risk
Market RiskSensitivity MeasuresThe Hedging PolicyInterest Rate Risk in the Banking BookIRRBB vs Market RiskExpected ShortfallEconomic Value of EquityVaR BacktestingOpen PositionValue at RiskValue at Risk and Expected ShortfallEconomic Value SensitivityFX ExposureValue at Risk vs Expected ShortfallEarnings at Risk vs…FX Transaction Risk vs…How to measure Interest…How to measure Foreign…
viLiquidity Risk
Liquidity Stress TestingLiquidity Gap vs Liquidity BufferMaturity MismatchThe Debt Maturity ProfileFunding ConcentrationSurvival HorizonThe Contingency Funding PlanNet Stable Funding RatioLiquidity Risk vs Funding RiskLiquidity Coverage RatioLiquidity Gap and BufferHow to run a Liquidity Gap Analysis
viiOperational Risk
Operational LossThe Loss EventRisk and Control Self AssessmentException ManagementInformation Security as a…Segregation of DutiesIssue ManagementThe Near MissRoot Cause Analysis in RiskThe Fraud TriangleCyber Risk vs Third Party RiskHow to run a…How to assess Third…
viiiRisk Reporting, Data and Model Risk
Model RiskModel Validation vs BacktestingHow to run Model ValidationData Governance in RiskModel Risk vs Data RiskKey Risk IndicatorsManagement InformationRisk ReportingRisk ScoreEarnings at RiskRisk Adjusted ReturnEarly Warning IndicatorsHow to build a KRI Dashboard
ixTreasury
Corporate TreasuryAsset Liability ManagementIntragroup FundingThe Treasury PolicyThe Treasury Management SystemThe Cash ForecastCash Pooling and ConcentrationHow to build a Cash Forecast
xFinancial Controls and Assurance
Control AssuranceThe Control LifecycleThe Assurance MapThe Audit FindingIssue RemediationInternal Financial ControlsControl Design vs Control EffectivenessHow to map Internal Financial ControlsHow to test Control…Control DeficiencyMaterial Weakness
xiOperational Resilience
Operational ResilienceBusiness Continuity and Disaster RecoveryBusiness Continuity vs Operational…Crisis ManagementDisaster RecoveryIncident Management

How to test Control Design and Effectiveness

Test design first and operation second, and stop the moment design fails. Restate the objective, walk one transaction to judge design, define the population and the period, choose a sample against the failure rate the test is intended to detect, gather evidence, classify every exception by the stage it belongs to, and conclude on the period with the base named. At the invented Vindhya Commercial Bank Limited it took 214 controls to 172.

Testing a control is a method rather than a definition. Control design and control effectiveness, how the two differ, and the bearing of the control under test on a reported number are all settled before any testing starts. The method adds the order of operations, the arithmetic behind the one step everybody gets wrong, and a conclusion that can be defended a year later to a stranger who was not in the room.

In what order should a control be tested?

The everyday case is a shop that weighs rice on a spring balance. There are exactly two questions that can be asked about that scale, and they are not the same question. The first is whether the scale, used exactly as the shopkeeper says he uses it, would give an honest weight at all. The second is whether he actually used it that way on every sale in the last year. The first question is about the instrument. The second is about the habit. How faithfully somebody performed a procedure that could never have worked is not information about anything. So the second question cannot be answered usefully until the first has been.

Control testing runs on exactly that split, and the eight steps below hold it. The eight steps are numbered TS1 to TS8 for teaching, and no bank record carries those labels. Everything from step TS4 onward exists solely to answer the second question, and it never begins until step TS3 has let it.

THE EIGHT STEPS IN THEIR FIXED ORDER, AND THE ONE THAT CAN END THE TEST The numbering TS1 to TS8 is a teaching structure. The counts belong to one invented bank. TS1 Restate the control objective as a sentence somebody can fail Settles what the test is measured against. Everything after this is measured against it. TS2 Test design: read the written control and walk ONE transaction Settles capability. One walkthrough answers it; forty walkthroughs answer it forty times. TS3 THE STOP RULE: if design fails, the test ends here 16 of this invented bank's 214 key controls stopped here, which is why the next test ran on 198. TS4 Define the population and the period Settles what a sample is a sample of, and what span of time the conclusion may cover. TS5 Choose the sample against the failure rate the test is meant to detect Settles what the test is capable of noticing. Written down BEFORE anything is selected. TS6 Select the items and gather evidence as a trace Settles whether it happened and whether it works, which are two different questions. TS7 Classify every exception back to the stage it belongs to Settles which failure was actually found. One exception can touch two stages at once. TS8 Conclude on the period, with the base named in the same sentence Settles what may be said, and hands the failures on to whoever writes them up.
Eight steps run in a fixed order and the third one can end the test outright, which is why the two tests in this invented bank have different denominators of 214 and 198.

What has to be settled before any evidence is gathered?

Step TS1 sounds like paperwork and is not. Before anything is looked at, the control objective has to be restated as a sentence that somebody could conceivably fail. The example is the collateral valuation control inside process PR3 at Vindhya Commercial Bank Limited. The objective, written so it can be failed, is this: no loan is marked on a stale valuation. The objective has a subject, a verb and a condition, and any item can be held against it and answered yes or no.

In real life the objective usually gets written as: to ensure that collateral values are appropriately maintained. Nothing can fail that sentence. Appropriately maintained is not a state of the world, it is a mood, so no item can be held up as breaking it. An objective that cannot be failed produces a test that cannot be failed either, and a test that cannot fail is not evidence, it is decoration. Everything from TS2 onward is measured against the sentence written at TS1, so a soft sentence quietly softens all eight steps at once.

The household version is a fair one. A teenager told to be sensible with the scooter leaves no way of establishing later whether they were. A teenager told that the scooter is never taken out after nine at night has been given a sentence with a fact attached to it, and both sides know what checking would even mean.

How is design tested, and what is enough to settle it?

Step TS2 has two parts and they run in this order. Read the written control, then perform a walkthroughFollowing one transaction through a control from start to finish to see what the control would do.: follow one transaction end to end, from the moment the valuation feed arrives to the moment the mark lands on the loan. Nothing is being counted. The question is a conditional one, and the conditional is the whole of it.

The question is: if this activity happened exactly as written, every single time, would no loan be marked on a stale valuation? Notice what that question does not ask. The question does not ask whether the activity did happen. It does not ask how often it happened. The question asks after capability on the best day the activity ever has. If the answer is no even on the best day, the control has a design gap and no amount of diligence in performing it can close that gap.

Design is a question about capability rather than about frequency, and that is exactly why one walkthrough settles it and a sample cannot improve on it. Walking forty transactions through the same written control shows the same capability forty times over. The second walkthrough adds nothing the first did not already establish, unless the control is genuinely different for different item types, in which case there is more than one control and TS1 should have said so.

STEP TS2: ONE LOAN, FOLLOWED END TO END THROUGH THE WRITTEN CONTROL Process PR3, collateral management and valuation, at the invented Vindhya Commercial Bank Limited. STAGE 1 the valuation feed arrives it carries a valuation date STAGE 2 the check compares that date with today a stale date is meant to halt it STAGE 3 the mark is applied to the loan and it feeds a provision THE CONDITIONAL QUESTION THE DESIGN TEST ASKS If this activity happened exactly as written every single time, would no loan be marked on a stale valuation? One transaction settles this. It is a question about what the activity can do, not about how often it was done.
The design test follows a single loan through three stages and then asks a conditional question, which is why one walkthrough settles it and a larger sample adds nothing.
Try it out

Why is the design test settled by one walkthrough rather than by a sample?

Ratio Analysis That Says Something — free micro-course from Fin Maverick

What happens to the test when design fails?

Step TS3 is the stop ruleEnding the test when design fails. How reliably an unworkable control was performed answers nothing., and it is the step most testing plans do not have. If the design test at TS2 says the control could not meet its objective even performed perfectly, the test ends there. No sample is drawn. No measurement is taken of how diligently it was performed. A high performance rate on an unworkable control establishes only that people are conscientious. Conscientiousness was never the question, so the measurement would be real work producing a real number that carries no information at all.

In this invented bank the design test ran on all 214 key controls. Sixteen of them failed it, being 16 over 214, or 7.5 per cent. The 16 design failures went no further. The operating test then ran on the 198 that remained. Twenty six of those failed, being 26 over 198, or 13.1 per cent. The reason the second denominator is 198 rather than 214 is the stop rule, and that makes it a design decision in the method rather than a gap in the fieldwork. End to end, 172 of the 214 controls that entered came out effective, being 80.4 per cent.

The 80.4 per cent is not the average of the two pass rates. Design passed 92.5 per cent and operation passed 86.9 per cent. Multiplied, the two rates give 80.4 per cent, exactly 172 over 214. Averaged, the two rates give 89.7 per cent, a full 9.3 percentage points too kind. A control has to survive both tests rather than one of them on average, and that is the whole of the difference. The 26 operating failures are 12.1 per cent of the whole 214, and 7.5 plus 12.1 is 19.6, the complement of 80.4.

THE STOP RULE IS WHAT MAKES THE TWO TEST POPULATIONS DIFFERENT SIZES Every count belongs to the invented Vindhya Commercial Bank Limited. Bars are drawn to scale on 214. DESIGN TESTED, ALL 214 KEY CONTROLS 198 passed 16 failed design 7.5 per cent of 214 OPERATION TESTED, ONLY THE 198 THAT PASSED DESIGN 172 passed 26 failed operation 13.1 per cent of 198 EFFECTIVE END TO END 172 of 214 80.4 per cent of the 214 that entered 92.5 per cent times 86.9 per cent is 80.4 per cent. The average of the two is 89.7 per cent and is 9.3 points too kind.
Sixteen controls stopped at the design test and never entered the operating test, so the two denominators are 214 and 198 by rule rather than by accident.
Try it out

Why did the operating test in this invented bank run on 198 controls rather than 214?

Spotting Quality of Earnings Red Flags teaches you to test whether a reported profit is a sound base to forecast from.

How are the population and the period defined for the operating test?

Once a control has survived TS3, the operating test begins, and it begins with two definitions rather than with any evidence. The populationEverything the control was supposed to act on in the period, and the set a sample is drawn from. is everything the control was supposed to act on. For the collateral valuation control, that is every loan marked in the twelve months, and not every loan on the books, and not every valuation received. Get the population wrong and every figure downstream is a share of the wrong thing.

The period is the second definition and it is the one people quietly bend. The assertion being tested is that the control operated effectively throughout the period, so the period here is the whole twelve months. Defining the period as the last month because that is where the records are tidiest does not make the test easier, it makes the conclusion smaller, and smaller in exactly the direction that hides things. The period is part of the conclusion rather than part of the convenience, and choosing it for the quality of the evidence settles the answer before any evidence is read.

Vindhya Commercial Bank Limited makes the point. The collateral valuation control did not operate for 11 working days, and those days fell in month 10. A test scoped to month 12 alone would have passed that control cleanly and truthfully, and would have missed the year's single most serious control finding while doing so.

STEP TS4: THE PERIOD DECIDES WHAT THE CONCLUSION IS ALLOWED TO SAY Twelve numbered months at the invented Vindhya Commercial Bank Limited. No calendar month is named. M1 M2 M3 M4 M5 M6 M7 M8 M9 11 working days with no control at all M11 M12 PERIOD A: THE WHOLE TWELVE MONTHS. THE ELEVEN DAYS SIT INSIDE IT. CONCLUSION MAY COVER THE WHOLE YEAR PERIOD B: MONTH 12 ALONE, CHOSEN BECAUSE THE EVIDENCE IS TIDIEST THERE. Passes cleanly and says nothing about month 10.
A test period chosen for the tidiness of its evidence would have passed this control honestly while missing the eleven working days it failed for.
Try it out

A test defines its period as the last month of the year because that is when the evidence is cleanest. What is wrong?

How big does a sample have to be, and what does the size actually depend on?

Sample size is the step everybody underestimates. A sampleThe items actually examined, whose size is a statement about what failure rate the test could have noticed. is not a quantity of comfort. A sample is a statement about what the test was capable of noticing. Where that statement cannot be said out loud, what has been chosen is not a sample but a number.

The whole of the arithmetic sits in the open. Suppose a control truly fails a share p of the time, and s items are examined, chosen independently of one another. The chance that all s come back clean is 1 less p, raised to the power s. That is it. Nothing else is needed, and independence between the items is an assumption rather than a fact of the world.

Turned around, it becomes a design tool. The failure rate the test is meant to catch is decided first, and then the smallest s that makes a clean result unlikely if the control really is failing at that rate. The rate chosen is the detectable rateThe failure rate a given sample size would be likely to catch, written down before anything is selected., and it goes on paper before a single item is selected. The tolerance used throughout for how often a clean sample from a genuinely broken control is accepted is 5 per cent. The 5 per cent tolerance is a working choice rather than a requirement, and every sample size that follows from it is arithmetic rather than rule.

Failure rate to be able to detectSmallest sample on the 5 per cent tolerance used hereRoughly three over the rate
25 per cent11 items12
13.1 per cent, this invented bank's own operating failure rate22 items23
10 per cent29 items30
5 per cent59 items60
2 per cent149 items150
1 per cent299 items300
0.5 per cent598 items600

Read from the bottom, the ladder makes the shape jump out. Halving the failure rate to be caught roughly doubles the sample needed: 29 items at 10 per cent, 59 at 5 per cent, 149 at 2 per cent, 299 at 1 per cent, 598 at half of one per cent. The rule of thumb is that the sample is about three divided by the rate, and it holds to within one item across the whole ladder. The exchange rate is brutal, and it is the honest one.

THE SAMPLE CLIMBS FAR FASTER THAN THE FAILURE RATE FALLS Smallest sample on the 5 per cent tolerance used here. Both scales are logarithmic. Nothing here is a standard. 11 29 59 149 299 598 ITEMS 25% 13.1% 10% 5% 2% 1% 0.5% FAILURE RATE THE TEST IS MEANT TO BE ABLE TO DETECT, FALLING TO THE RIGHT 13.1 per cent, this invented bank's own operating failure rate: 22 items the habitual sample of 25 items detects about 11 per cent and no better
Halving the failure rate to be caught roughly doubles the sample needed, so the curve climbs from 11 items to 598 across the ladder.
Try it out

A tester says the sample is 40 items because that is the standard for a daily control. What has not been done?

Try it out

A tester examines 25 items and finds nothing wrong. Before the control below is moved: what failure rate was that test actually capable of catching?

Play with it

Drag the failure rate down and watch the sample climb

One variable: the operating failure rate the test is intended to detect, from 25 per cent down to 0.5 per cent. One consequence: the smallest sample that leaves at most a 5 per cent chance of a clean result from a control failing at that rate. The default sits at 13.1 per cent, this bank's own operating failure rate of 26 of the 198 controls tested. Catching a rate that size needs 22 items.

25.0 PER CENT13.1 PER CENT0.5 PER CENT
SMALLEST SAMPLE AGAINST THE FAILURE RATE THE TEST IS MEANT TO DETECT 11 29 59 149 299 598 FAILURE RATE FALLING TO THE RIGHT, FROM 25 PER CENT AT THE LEFT EDGE TO 0.5 PER CENT AT THE RIGHT SMALLEST SAMPLE AT THIS RATE, DRAWN ON A LOGARITHMIC SCALE 22 items THE HABITUAL SAMPLE OF 25 ITEMS, ON THE SAME SCALE, FIXED 25 items CHANCE THAT A SAMPLE OF 25 COMES BACK CLEAN ANYWAY AT THIS RATE 3.0 per cent The 5 per cent tolerance is a working choice and not a requirement. Every count belongs to one invented bank.
Rate to be detected
13.1 per cent
Smallest sample
22 items
A clean 25 anyway
3.0 per cent

To be confident of catching a failure rate of 13.1 per cent, the smallest sample is 22 items, and at that rate a habitual sample of 25 would come back clean anyway only 3.0 per cent of the time.

Educational illustration. The 5 per cent tolerance for accepting a clean sample from a broken control is a working choice and not a requirement, and the arithmetic behind every sample size assumes each item is examined independently of the others. The assurance standard and the guidance note are held by the Institute of Chartered Accountants of India at icai.org.

At the far right of the control the number stops looking like a sampling question and starts looking like a resourcing question. Resourcing is what it always was. A control tested down to a failure rate of half of one per cent costs 598 items of somebody's attention. The cost may be worth it for the control that feeds the collateral mark on Rs 8,640 crore of secured advances, and it is plainly not worth it for a control over stationery. The judgement belongs to the people accountable for it, and the arithmetic at least forces them to make it out loud.

Equity Research Bootcamp — Fin Maverick

What counts as evidence, and what does a tester do with an exception?

Step TS6 selects the items and gathers evidence, and evidence here has a specific meaning: a trace that a stranger can check a year later without asking anybody anything. For each selected loan at this bank, the trace has three parts. The valuation date carried on the feed. The date the mark was applied to the loan. And the record that the check itself actually ran on that date. The third one is the one that is usually missing, and it is the only one of the three that speaks to the control rather than to the transaction.

Two ways of gathering that trace answer different questions, and the difference is worth holding. InspectionLooking at the record the control left. It answers whether the control happened. means looking at the record the control left behind, and it answers whether the control happened. Re-performanceDoing the control again yourself. It answers whether the control works. means doing the control again yourself, and it answers whether the control works. A signature is evidence of a signature and not evidence of a judgement. A control judged only by the record it left can be a control nobody ever actually thought about.

STEP TS6: TWO WAYS OF GATHERING EVIDENCE, ANSWERING TWO DIFFERENT QUESTIONS Both are needed. Neither substitutes for the other. INSPECTION Looking at the record the control left Answers: DID IT HAPPEN? The check ran on this date, and here is the log line that says so. RE-PERFORMANCE The control is performed again Answers: DOES IT WORK? The two dates are compared directly to see whether the mark should have been stopped. A test that uses only one of the two has half an answer and usually does not say which half.
Inspection establishes that the control happened and re-performance establishes that the control works, so a test using only one of them carries half an answer.
THE EVIDENCE SET FOR ONE SAMPLED LOAN HAS THREE FIXED PARTS Three traces a stranger can check a year later without asking anybody anything. TRACE 1 the valuation date carried on the feed about the transaction TRACE 2 the date the mark was applied about the transaction TRACE 3, USUALLY MISSING the record that the check actually ran about the CONTROL THE CLAIM THE TEST EXISTS TO EXAMINE A memorandum, invented, stating that the staleness check is performed daily.
Two of the three traces describe the transaction and only the third describes the control, which is why the third is the one a weak test quietly drops.
Try it out

The evidence for a sampled item is a screenshot showing the check exists in the system. Is that evidence the control operated?

Step TS7, and the exception that turned out to be two findings

An exceptionAn item in the sample where the control did not do what was claimed. Each one is classified by stage. is an item where the control did not do what was claimed for it, and every exception has to be classified back to the stage it belongs to. Most of them are simple. The control exists, it works, somebody skipped it on this item, and that is an operating failure at stage CL4 of the control lifecycle.

The bank produced an exception that is not simple, and it is the reason the step exists. The collateral valuation control did not operate for 11 working days and 340 loans were wrongly marked. No customer lost money and the net loss booked was Rs 1.4 crore. So far that is an operating failure. But read the second half of the sentence: no monitoring control detected it, for eleven consecutive working days. The eleven days are an operating failure of the control being tested. The silence around them is a question about whether anything was ever designed to notice, and that is a stage CL3 design question about a different control altogether.

Classifying the whole thing as one operating failure loses the second half, and the second half is what made this the year's single material weakness, touching the valuation of Rs 8,640 crore of secured advances. The everyday version is the smoke alarm. If the kitchen caught fire and nobody was in the house, the fire is one problem. The alarm never going off is a completely different problem, and only one of the two gets fixed by being more careful with the stove.

STEP TS7: ONE EXCEPTION, CLASSIFIED BACK TO TWO DIFFERENT STAGES The control lifecycle stages CL3 design and CL4 operation, at the invented Vindhya Commercial Bank Limited. THE EXCEPTION AS FOUND The control did not operate for 11 working days, 340 loans were wrongly marked, and nothing noticed. STAGE CL4, OPERATION The control did not operate Fixed by making the activity happen every day. Net loss booked Rs 1.4 crore, invented. STAGE CL3, DESIGN Nothing was built to notice Fixed only by designing a monitoring control that does not exist yet. A design gap is fixed by changing the control. An operating failure is fixed by making people do it. Neither fix substitutes for the other.
One exception splits into an operating failure and a design question, and the two need different fixes because neither substitutes for the other.
Try it out

A control did not operate for eleven working days and nothing in the bank noticed. How many stages does that exception touch?

How is the conclusion written, and what does it have to name?

Step TS8 is a sentence, and the sentence has a fixed shape. The conclusion states the result, the period, the population, the sample and the base, all in the same place. Nobody reading it later can then quietly attach it to a different denominator. Something of the form: over the twelve months, on a population of every loan marked in the period, a sample of 22 items chosen to be able to detect a failure rate of 13.1 per cent produced no exception, so the control is concluded effective for the period on that basis.

Every clause in that sentence is load bearing. The one people drop is the basis, and the basis is exactly the clause that says what the test could have seen. Across the whole of this invented bank the same eight steps produced 172 controls effective of the 214 that entered, being 80.4 per cent, and that figure is reached as 214 less 16 design gaps less 26 operating failures. The 80.4 per cent is never reached by multiplying one rate by another and then rounding, and the rate is never quoted without the count beside it.

StepWhat it settlesWhat it hands to the next step
TS1 objectiveWhat the control must not let happenA sentence that can be failed
TS2 designWhether the activity could ever meet itA pass, or a design gap
TS3 stop ruleWhether the test continues at all198 of the 214 continued
TS4 population and periodWhat a sample is a sample of, and over what spanEvery loan marked in twelve months
TS5 sampleWhat failure rate the test could notice22 items at 13.1 per cent
TS6 evidenceWhether it happened and whether it worksThree traces for each item
TS7 exceptionsWhich stage each failure belongs toCL3 gaps and CL4 failures, kept apart
TS8 conclusionWhat may honestly be said about the period172 effective of 214, being 80.4 per cent

The sample of twenty five that nobody ever questioned

Here is how this goes wrong, and it goes wrong quietly. A tester picks 25 items because 25 is the size everybody uses. Nothing is found. The working paper records that the control operated effectively. Every review meeting accepts it. Twenty five looks like a serious number, and nobody in the room has ever asked the question the number is an answer to.

The arithmetic on that test shows what it could actually do. On the 5 per cent tolerance used here, a clean sample of 25 items is enough to be reasonably confident about a failure rate of roughly 11 per cent and no better. Against a control failing one time in a hundred, a sample of 25 comes back clean about 78 per cent of the time, or close to eight times in ten. So the working paper that says nothing was found is telling the truth and telling almost nothing.

The awkward part is that at this particular bank, 25 would have been sound. Its own operating failure rate across the tested population is 13.1 per cent, and detecting a rate that size needs 22 items, so 25 clears it comfortably. The fit is luck, not method. The number was chosen before anybody asked what question it was answering. A sample chosen by habit is a test for a badly broken control and nothing else, and the tester almost never says so out loud. Every sample size in the ladder above is arithmetic on a stated tolerance rather than a figure lifted from a standard. The assurance standard and the guidance note behind this kind of work are held by the Institute of Chartered Accountants of India.

A CONTROL FAILING ONE TIME IN A HUNDRED: HOW OFTEN A SAMPLE COMES BACK CLEAN Chance of seeing no exception at all, plotted against the number of items examined. 100% 75% 50% 25% 0% 25 items: still 77.8 per cent chance of a clean result 299 items brings it down to 5.0 per cent 0 100 200 300 ITEMS EXAMINED. The dashed line is the 5 per cent tolerance used here and is not a requirement.
A control failing one time in a hundred survives a clean sample of 25 items about eight times in ten, and needs 299 items before that stops being likely.
Financial Literacy Bootcamp — Fin Maverick

Who actually uses this method, and what do they do with the result?

Four people read the output of these eight steps, and they read it for four different things. Knowing that matters before step TS8 is written.

Rustom Batliwala, head of internal audit at this invented bank, uses the method to plan a year of work. His constraint is not curiosity, it is hours. The sample ladder turns a wish into a plan. A testing cycle that wants to detect a 2 per cent failure rate on forty controls has committed to roughly 149 items each, or nearly six thousand items of somebody's attention, and that number arrives before the year starts rather than in month 9. The ladder is a budgeting instrument as much as a statistical one, and the testing plan that never does this arithmetic simply discovers it late.

The independent director on the audit committee reads the conclusion, and reads it for one thing above all: what base was it drawn on. A committee shown 86.9 per cent effective is being shown the pass rate on the 198 controls that reached the operating test. A committee shown 80.4 per cent is being shown the whole 214. Both are true, they differ by 6.5 percentage points, and only one of them answers the question the committee thinks it is asking.

Vivek Anantharaman, the chief financial officer, reads it for the link to a reported number. A stale mark feeds a provision and a provision feeds a reported figure, and that is why the collateral valuation control matters at all. And a credit analyst at another institution, looking at a bank from outside as a counterparty, reads whatever is published for the shape of the failures rather than the count. Sixteen design gaps means sixteen controls that were never going to work; twenty six operating failures means twenty six controls that would have worked if somebody had performed them. The two shapes of failure are two different institutions wearing the same headline percentage.

The mechanism does not change with scale, so here is the household version. A person running a small tuition class wants to know whether the attendance register was actually filled every day. Checking five days out of two hundred is not a light version of checking properly, it is a test that can only catch a teacher who never filled it at all. Catching the one week in the year that got skipped takes more than five days, and knowing that before the checking starts is the whole of step TS5.

What can this method not do?

Three things, and each of them is a limit rather than a weakness.

The method cannot prove a control never failed. A sample of s items on a control failing a share p of the time comes back clean with probability 1 less p raised to s, and that number is never zero for any sample short of the whole population. A clean sample is evidence of absence only to the extent the sample was capable of finding something, and the conclusion at TS8 carries its basis for exactly that reason. A clean 299 items says a failure rate of about 1 per cent or worse is unlikely to have escaped notice, on the tolerance used here. The same clean 299 says nothing whatever about a control that failed twice in a year in a corner the sample never touched.

The method cannot rescue a control that left no record. If the third trace was never kept anywhere, and nobody recorded that the check ran, then the control cannot be tested for operation at all, and that is itself a finding rather than a scheduling problem. An untestable control and an ineffective control are not the same thing, but they land in the same place in a report and they should.

And it says nothing about tomorrow. Every one of these eight steps looks backwards over a defined period. A control that operated perfectly for twelve months and whose one experienced operator left in month 12 has a clean test result and a problem, and no amount of sampling the past will surface it. The test is a statement about a period that has ended.

Try it out

A control passes its operating test with a clean sample of 299 items. Has it been shown never to have failed?

Where does the standard behind this work come from?

Everything above is arithmetic and craft rather than rule, and where the rules actually live is worth being precise about.

India

What is named here, and where the binding version lives

Every control count, failure count, rate, loss and rupee figure on this subject belongs to Vindhya Commercial Bank Limited, and none of the arithmetic above is a requirement.

The assurance standard and the guidance note under which work of this kind would be performed in India are held by the Institute of Chartered Accountants of India at icai.org. The reporting duty that such work serves sits in the Companies Act, and its text, its applicability, its exemptions and the form of the report all come from the Ministry of Corporate Affairs at mca.gov.in. Additional binding requirements on a bank, including its risk management and control arrangements, come from the Reserve Bank of India at rbi.org.in.

Every sample figure is arithmetic on the stated 5 per cent tolerance, and that arithmetic assumes each item is examined independently of the others. Section numbers, rule numbers, thresholds, exemptions and effective dates live in the issuing body's own text and nowhere else.

Try it out

Which body holds the assurance standard and the guidance note this method would be performed under in India?

Control design and control effectiveness, and the six ways the two tests differ, are covered separately and assumed here. Exception management as a process, meaning how an exception is raised, logged, approved and cleared in the running of a business, is covered separately, as are segregation of duties and root cause analysis. How a control is mapped back to a reported number is settled before step TS1 begins. The written finding and its five parts, the four point rating scale, issue remediation and the material weakness each sit elsewhere, and step TS8 hands to them. The statutory audit is covered outside this sequence.

Sources

SourceDocumentSite
Institute of Chartered Accountants of IndiaThe assurance standard and the guidance note behind reporting on internal financial controls, including anything on sampling and evidenceicai.org
Ministry of Corporate AffairsThe Companies Act duty on internal financial controls, its applicability, its exemptions and the form of the reportmca.gov.in
Reserve Bank of IndiaWhat actually binds a bank in India on risk management, internal control and assurance arrangementsrbi.org.in

Vindhya Commercial Bank Limited, Rustom Batliwala and Vivek Anantharaman are invented.
Educational material. Not advice on any investment, tax, budget or market position.

← PreviousNext →
Fin Maverick Micro CoursesExplore Micro Courses
Fin Maverick BootcampsExplore Bootcamps
Fin Maverick

Finance education that ends in a job, not a certificate that gathers dust. Built for young India.

LEARN
CalculatorsFrameworksComparisonsCareersShowdown
RESOURCES
All CoursesMicro CoursesBootcampsInternships
COMPANY
AboutJob openingPartnership
LEGAL
Privacy PolicyTerms & ConditionsContent LicenseReturn & Refund Policy
© 2026 FIN MAVERICK / BUILT FOR INDIA.DO FINANCE, DO NOT JUST READ ABOUT IT.