Fin Maverick
Foundations VocabularyAccounting & ReportingEconomics & MacroQuant Methods & ProgrammingBusiness & Company AnalysisCorporate Finance & ValuationBehavioural Finance
Banking & Market InfrastructureFixed Income & RatesDerivatives & Structured ProductsPublic EquitiesTransactions & DealsPortfolio ConstructionFunds & AMCs
Private Markets & AlternativesRisk, Treasury & ControlAI & Digital FinanceStochastic Calculus & PricingWealth & Personal FinanceIndian Markets & RegulationProfessional Practice
CalculatorComparison
Frameworks
Explore Bootcamps
Equity ResearchPortfolio ManagementMutual Fund MasteryFinancial LiteracyInvestment Banking Analyst
Private Equity AnalystHedge Funds AnalystBreaking Into VCBreaking Into QuantsAI For Finance
Financial Analyst ProgramRisk Management ProgramPrivate Wealth ManagementDebt Capital MarketsDerivatives Foundation
Explore Internships
Equity Research InternMutual Fund Intern
Portfolio Management InternFinancial Literacy Intern
Explore Micro Courses

Equity Research6

Writing an Investment ThesisBuilding a Discounted Cash FlowReading an Annual Report FastReading a Sector Before a CompanySpotting Quality of Earnings Red FlagsBuilding a Revenue Forecast From Drivers

Portfolio Management3

Rebalancing: When, Why and What It CostsStrategic and Tactical Asset AllocationMeasuring Risk in a Portfolio

Mutual Fund Mastery3

Comparing Funds Without Being FooledHow a NAV Is Struck and Which Day You GetReading a Fund Factsheet Properly

Derivatives Unlocked4

Hedging a Real ExposureThe Greeks, PracticallyFutures, the Basis and What Moves ItReading an Option Payoff

AI For Finance2

Retrieval and Grounding for FinanceDocument Extraction in Finance

Breaking Into Quants4

Backtesting a StrategyHypothesis TestingCleaning Financial DataRegression for Finance

Breaking Into VC3

Sizing a MarketReading a Term Sheet as a FounderHow a Venture Round Actually Works

Financial Analyst Program4

Common Size and Trend AnalysisReading a Cash Flow StatementRatio Analysis That Says SomethingBuilding a Working Capital Schedule

Risk Management Program2

Credit Exposure and How It Is ReducedValue at Risk and What It Hides

Investment Banking Analyst3

Precedent Transactions and Why They DifferReading a Term Sheet StructurallyBuilding a Comparable Companies Table

Private Wealth Management3

Tax Aware Portfolio DecisionsBuilding a Client Risk ProfileGoal Based Planning Arithmetic

Debt Capital Markets3

Analysing an Issuer's CreditDuration and What It Does Not Tell YouBond Pricing and Yield Mechanics

Private Equity Analyst2

Fund Waterfalls and CarryThe LBO in Structure

Hedge Funds Analyst2

Short Selling MechanicsLong Short Mechanics
Courses
Explore Career Roadmaps
Investment Banking AnalystEquity Research AnalystVC AnalystPrivate Equity AnalystHedge Funds Analyst
Quant AnalystAI For FinanceFinancial Analyst ProgramPrivate Wealth ManagementDebt Capital Markets
Risk Management ProgramDerivatives FoundationPortfolio ManagementMutual Fund Mastery
PartnershipsShowdown
Log inSign up
Debt Capital Markets · CoreTrack
1Fixed Income, Credit & Rates
iBond Fundamentals
The BondBond Price and YieldPrincipalRedemptionFace Value, Par and PrincipalThe CouponThe IndentureThe IssuerMaturityFixed Income and Debt Securities
iiBond Pricing and Yield
What a Bond Yield…The Policy Rate and a Bond YieldCurrent Yield and Yield to MaturityYield to Maturity and Yield to CallThe Coupon and the YieldReinvestment RiskCarrySpread Return and Price Return
iiiInterest Rate Risk
Duration and ConvexityDuration and Convexity Calculator,…Key-Rate Duration vs Modified DurationThe Basis PointAccrued InterestRecovery RateSpot Rate and Forward RatePrepayment Risk and Extension RiskA Rate View and a Credit ViewInterest-Rate Risk and Reinvestment RiskHow to Analyse a…How to Review Prepayment…How to Analyse a…
ivRates Markets
The Term Structure of Interest RatesThe Yield CurveThe Forward RateThe Term PremiumParallel Shift vs Steepening…
vCurve and Carry Strategies
Curve StrategySteepener, Flattener and ButterflyHow to Read a…How to analyse a Yield-Curve ScenarioThe Butterfly TradeCarry and Roll-Down
viSovereign Bonds
Sovereign BondsPar Bond and Premium BondGovernment SecuritiesHow to Compare Government…Inflation-Linked BondsBond Total ReturnBond LadderHow to Read a Bond Term SheetHow to Map the…How to Analyse a…Treasury BillsTreasury Bill vs Sovereign BondThe Benchmark YieldThe Policy Rate and the Bond Market
viiCredit Risk
Credit RiskCredit Risk and Interest Rate RiskG-Spread, Z-Spread and Option-Adjusted…Credit SpreadTerm Premium and Credit SpreadHow to Build an…Rating ActionsDefault Rate, Loss Given…Expected Credit LossWhat a Credit Rating…A Rating Watchlist EntryThe Fallen AngelThe Credit CurveInvestment Grade and High YieldCollateral vs Guarantee
viiiCredit Analysis
Credit AnalysisCollateral, Guarantee and Credit…How to analyse a…Seniority and SubordinationCovenantsLeverage RatiosGross Leverage and Net Leverage
ixCredit Events and Recovery
Credit EventsCredit Event vs Liquidity EventHow to update Credit…The Distressed ExchangeThe Default NoticeCovenant Breach vs Restructuring EventHow to analyse Default…
xSecuritisation
SecuritisationOriginator, Servicer and Trustee…How to map a…Mortgage-Backed SecuritiesThe TrancheAsset-Backed SecuritiesAsset-Backed Security vs Mortgage-Backed SecurityCredit EnhancementPrepaymentThe Cash Flow WaterfallExtension RiskWeighted Average Life
xiFixed Income Portfolios
Ladder, Barbell and BulletFixed Income Portfolio MeasuresBarbell vs BulletHow to Map the…Tracking Error in Fixed Income
xiiFixed Income Research
Fixed Income ResearchFixed-Charge CoverageHow to assess Fixed-Income…How to Write a…The Four Assumptions That…A Liquidity Assumption and…The Spread ThesisStating Limitations in Fixed…

How to Map the Exposures in a Fixed Income Portfolio

An exposure map is eight steps that end in a labelled grid, not in a single number. Write the base and its date. Record the benchmark. Difference the two MODIFIED durations. State the move and its shape. Compute the whole exposure. Split it into the benchmark part and the active part. Draw every unfillable row empty with its reason. Then say what has been established.

The word map is doing real work in that sentence. A measurement gives a number. A map gives a sheet on which some questions have answers written against them, some have a reason written where the answer would have gone, and every one of them has been asked out loud. A question nobody wrote down is a question the next reader will assume somebody answered. Most of the value in an exposure map sits in the second kind of row.

What is an exposure map, and what does it come out as?

Picture a stall outside one office building. At the end of the month the person running it adds up what is owed. The total is exact, because every slip is in the tin. Beside that total, the stall can also write how much is owed by the one customer who always settles late, because that customer is known by name. The stall has never kept a record of how the other customers pay, so it cannot write how many of them will settle late.

Three lines, then. The first two are filled from what exists. The third is left blank with a short note saying why. The guess gets used and the blank does not. A sheet with the third line blank and explained is the better sheet. A blank line with a reason beside it is the whole idea of an exposure map, and everything below applies that idea to a bond portfolio, in an order that leaves no room for skipping the awkward rows.

So what does the finished thing come out as? A grid. Rows are questions somebody will eventually ask about the portfolio. Cells hold either a figure with a label attached to it, or a reason written where a figure could not go. The map produces no verdict, no ranking and no single headline number, and the reason it produces none is that the questions it can answer and the questions it cannot both have to survive onto the same sheet.

Eight steps in one order, and what each one puts on the map. 1 STATE THE BASE AND THE DATE puts down one rupee amount, dated 2 RECORD THE BENCHMARK puts down a benchmark figure 3 TAKE THE DIFFERENCE puts down a size and a sign 4 STATE THE MOVE AND ITS SHAPE puts down a stated assumption 5 COMPUTE THE WHOLE EXPOSURE puts down one labelled cell 6 SPLIT IT, LABEL BOTH PARTS puts down two labelled cells 7 ATTEMPT EVERY REMAINING ROW puts down empty cells with reasons 8 SAY WHAT IS AND IS NOT SETTLED puts down two short lists
The eight steps run in one fixed order, and each one puts either a labelled figure or a reasoned blank onto the sheet, which is what stops a bare number reaching the reader.

Two habits make the difference between a map and a pile of arithmetic. The first is that the steps run in a set order. Each step consumes what the step before produced. The second is that a step which cannot produce a figure still has to produce something. The set order and the reasoned blank are the method. Everything else here is the specific eight rows a bond portfolio needs.

Step one: what single figure does everything else become a share of?

Write down the market value of the portfolio, and write the date it was struck on beside it. The dated amount is the base. Every later cell on the map is either a share of the base or a rupee amount worked out from it, so a map whose base is undated is a map whose figures cannot be checked against anything six weeks later.

The valuation date matters for a reason a household will recognise. When somebody says their savings come to a certain amount, the sentence is useless until it is clear whether they meant this morning or last Diwali. A portfolio is the same object with more zeroes on it. Step one produces a single dated rupee amount and nothing else. Making it a step rather than a heading is what stops it being skipped.

One decision inside step one shapes every weight further down the map. The two options look interchangeable and are not, so the table below sets them side by side.

Base the weights are shares ofWhat a single holding contributes to itUsed on this map
Market valueWhat a holding would fetch if valued on a stated date, rather than what it will eventually repay. It moves as prices move.What that holding is worth on the valuation dateYes, throughout
Face amountWhat that holding will repay when it maturesNever, anywhere

Two holdings repaying the same face amount can be worth different amounts on the same afternoon, because they carry different prices. A weighted average built on the second row of that table is a different number wearing the first row's label, and nothing on the sheet will tell a later reader which one was built. Every weight discussed anywhere on this map is a share of market value, and the sentence carrying the weight says so rather than leaving it to a footnote.

Step two: what is the portfolio being measured against?

Write down the benchmark and the MODIFIED durationHow far a price shifts when the yield shifts a little, given as a rate of response and not as a span of years. Its construction from a schedule of payments is covered separately. it carries. Recording those two things is the entire step. The benchmark is not assessed, not questioned as the right one, and not adjusted. The step records which yardstick the rest of the sheet will lean on.

Step two gets left out more often than any other, and leaving it out does not fail loudly. The failure is quiet: the map looks complete and reports differences against nothing in particular. Every cell carrying the word active further down is a difference against something. If there is no benchmark, write that down as the answer to step two and stop expecting an active column. With nothing to difference against, the map has one column where it would otherwise have three.

Step two decides whether the map has one column or three. PORTFOLIO BENCHMARK DIFFERENCE with a benchmark, three columns the map has an active column PORTFOLIO nothing to record here nothing to difference without one, a single column every active cell goes with it
Recording the benchmark is what gives the map an active column at all, and a map without one still has a base and a whole exposure to report.
Try it out

There is no benchmark for the portfolio being mapped. Which parts of the map can still be completed?

Debt Capital Markets Bootcamp — Fin Maverick

Step three: what does the difference between the two figures have to carry?

Write down three things: the portfolio's MODIFIED duration, the benchmark's, and the portfolio's less the benchmark's. The third of those is the cell people copy out and quote, so it has to survive being copied. A cell that survives being copied carries a direction as well as a size.

A portfolio whose MODIFIED duration sits above its benchmark's is positioned longer. One sitting below is positioned shorter. Positioned longer and positioned shorter are opposite arrangements that produce identical sizes, and a cell recording only the size has thrown away half of what step three was for. Notice too that neither phrase is a forecast. Positioned longer describes how the sheet currently reads, not what anybody expects to happen next.

Step three is also where the labelling discipline of this sequence earns its keep. A MACAULAY durationThe average wait before the payments arrive, weighted by what each is worth today and counted in years. It is a different object from the MODIFIED figure, and swapping them skews a result by one plus the yield. and a MODIFIED duration are different objects that both get called duration in conversation. Difference one against the other and the answer is wrong in a way nothing on the sheet will reveal, so every cell on this map carries the word MACAULAY or the word MODIFIED against any figure of that kind.

Step four: what move is being priced, and what shape is it?

Write down how large the move is, counted in basis pointsThe unit rate moves get counted in. A single percentage point holds a hundred of them, so writing either unit where the other belongs scales an answer a hundredfold. and write its shape beside it. Then write the word assumption against both. Neither of them was observed. Nothing in the arithmetic below observed a move, forecast one or argued for one.

The shape used throughout this material is PARALLEL, meaning every point on the SPOT curveThe set of rates for money lent today and repaid at a single future date. Every rate in this subject area is marked as a SPOT or a FORWARD rate so the two are never merged. moves by the same amount at the same time. PARALLEL is not a description of how curves behave. The shape is a simplification, declared so that a single sensitivity figure is enough to price the move.

Every rupee figure this map produces is standing on the shape recorded at step four, and the map states that shape in the same breath as the figure rather than in a note beneath the grid. A move of any other shape asks something else and answers it differently, and is covered separately. No scenario of another shape is recorded for this portfolio. The missing scenario turns into an empty row at step seven rather than into a smaller number here.

Step four records a shape as an assumption, not as a fact. PARALLEL ANY OTHER SHAPE steepening, flattening, a twist priced nowhere on this map every point moves by the same amount no scenario of another shape exists here Every rupee figure on this map rests on the shape in the left panel.
Under a parallel move the whole curve lifts by one common amount, and the map prices that shape alone because no scenario of another shape exists here.

Step five: what does the stated move cost the whole base?

Take the portfolio's MODIFIED duration, apply it to the size of the move recorded at step four, and apply that to the base recorded at step one. Write the result into the cell labelled WHOLE EXPOSURE. Two rules attach to the writing rather than to the arithmetic: do not put the figure into any cell that is not labelled, and do not put it anywhere without the move sitting beside it.

Step five produces a first order estimateAn answer built from a straight line laid against a curve. It is close for small moves and drifts as the move gets larger, in a direction settled elsewhere.. The estimate multiplies a sensitivity by the size of a move and stops there. The correction that would make it exact, and the direction in which the uncorrected figure tilts, both belong to convexityThe curvature a straight line sensitivity misses. It is covered separately, and this map takes the uncorrected estimate as it stands.. Convexity is covered separately, and the map takes the estimate as it stands.

Step six: how does one figure become two that add back to it?

Apply the benchmark's MODIFIED duration to the same move on the same base. The result is the BENCHMARK PART. Apply the difference from step three to the same move on the same base. The second result is the ACTIVE PART. Then add the two and check that they come back to the figure from step five.

The check looks like decoration and is not. The check cannot fail on correct inputs, and that is exactly what makes a failure informative: the only way these three figures come apart in practice is that somebody changed a base or a move between two lines of a spreadsheet. The addition is what proves the two parts are two views of one calculation rather than two separate calculations that happen to sit near each other.

Step six does a second thing as well, and that second thing is why the split earns a step of its own. The split shows a reader how much of the exposure arrived with the benchmark and how much arrived with somebody's decision. The two quantities are usually nothing like the same size, and a reader who has never seen them separated tends to assume they are closer than they are.

Mutual Funds Bootcamp — Fin Maverick

Step seven: what happens to a row that cannot be filled?

Attempt every remaining row. Where the inputs exist, fill the cell and label it. Where they do not, draw the cell empty and write the reason inside it, in the space where the figure would have gone. There is no third path. A row that is neither filled nor drawn empty has been deleted, and a deleted row is a map claiming to be complete.

The rows that remain are, awkwardly, the rows a reader most wants. The cost of a curve move of another shape. The holdings, split by industry. The borrowers, and how much of the base the largest of them accounts for. The money that has arrived or left, and when. Each of those is a fair question, and each gets attempted. Attempting a question is a different thing from answering it.

Step seven is a branch with two exits and no third one. TAKE THE NEXT ROW Do the inputs exist? YES NO The inputs exist. Write the figure and its label. The inputs do not exist. Draw the cell empty, with the reason where the figure goes. A row that took neither exit was deleted, and a deleted row leaves no trace of the question.
Every row is attempted, and a row whose inputs do not exist is drawn empty with the reason written where the figure would have gone.
Try it out

Four rows remain: what a curve move of another shape would cost, what is held by industry, who the borrowers are, and what money has arrived or left. How many of the four can be filled from the inputs recorded here?

The reasons are not interchangeable, and writing the specific one inside each cell is what makes the blank readable. A cell reading nothing available says nothing. A cell saying that no split by industry is recorded here tells the next reader precisely which input would have to appear before that row could ever be filled, and that is a usable instruction rather than a shrug.

Try it out

A reviewer asks for the empty rows to be removed so the map looks finished. How should that request be answered?

Step eight: what has the finished map settled, and what has it left open?

Write two short lists. The first names what the filled cells support. On any map built this way that comes to the cost of a stated move, in total and in the part attributable to positioning. The second names everything the empty cells leave open, spelt out rather than left for a reader to notice.

Then add one line that no step above produced, and none of them could have. The map says what a position costs under a stated move and says nothing at all about whether that position should be held. Somebody had already chosen to sit the portfolio longer than its benchmark, well before this sheet existed. The eight steps price that decision. The eight steps do not endorse it, do not argue for closing it, do not argue for widening it, and hold nothing that could support any of the three.

Try it out

Step eight asks for two lists. Which entries go in the second one?

What do the eight steps produce when they run on one portfolio?

Here is the whole sequence run end to end on the portfolio this material records. Every figure below was written for teaching. Where each number lands, and what label it lands with, is the whole of the lesson.

Step one. The base is Rs 5,000 crore of market value, struck on the stated valuation date. Every figure below is a share of that amount or a rupee amount computed from it.

Step two. The benchmark carries a MODIFIED duration of 4.80. Recorded, not assessed.

Step three. The portfolio's MODIFIED duration is 5.20 and the benchmark's is 4.80, so the difference is 0.40. The direction goes into the cell alongside the size: the portfolio's figure is the higher of the two, so it is positioned longer.

Step three writes down a size and a direction, never a size alone. 0.40, and it carries a sign THE BENCHMARK MODIFIED duration 4.80 THE PORTFOLIO MODIFIED duration 5.20 positioned longer, because the portfolio's figure is the higher of the two
The difference cell holds 0.40 and the direction together, because a size on its own is equally true of a portfolio sitting under its benchmark.
Try it out

The portfolio's MODIFIED duration is 5.20 and the benchmark's is 4.80. Which figure goes in the difference cell, and what has to go with it?

Step four. The move is a rise of 100 basis points. Written the other way round, that comes to 1.00 percentage point. Its shape is PARALLEL. Both go on the sheet marked as an assumption.

Step five. A MODIFIED duration of 5.20 set against a rise of 1.00 percentage point works out at 5.20 per cent of the base, so the answer on a base of Rs 5,000 crore comes to Rs 260 crore. The figure goes into the cell labelled WHOLE EXPOSURE, with the move written beside it.

Try it out

Step five has produced a whole exposure of Rs 260 crore under a PARALLEL rise of 100 basis points. Before step six runs, how much of that should be expected to attach to the positioning decision?

Step six. The benchmark's 4.80 against the same move on the same base works out at 4.80 per cent of the base, so Rs 240 crore goes into the cell labelled BENCHMARK PART. Applying the 0.40 difference to the same move on the same base works out at 0.40 per cent, so Rs 20 crore goes into the cell labelled ACTIVE PART. Adding the two, Rs 240 crore and Rs 20 crore come to Rs 260 crore, and the check closes.

Look at the proportion rather than at the two amounts. Almost the whole of what a parallel rise costs this portfolio arrived with the benchmark, before anybody chose anything. The part attributable to the positioning decision is one rupee in every thirteen of the total, and that ratio is the single most useful thing the split produces.

One computed figure, split into two that add back to it. WHOLE EXPOSURE Rs 260 crore BENCHMARK PART Rs 240 crore the part that came with the benchmark no decision produced it Rs 20 crore ACTIVE PART
Under the same PARALLEL rise, a whole exposure of Rs 260 crore separates into Rs 240 crore inherited from the benchmark and Rs 20 crore attributable to positioning, and the pair rebuild the first figure.
Try it out

The two split figures do not add back to the figure from step five. Where has the error crept in?

Step seven. Four rows come back empty, each carrying its own reason inside the cell. Step eight. The map establishes what a stated PARALLEL rise costs, in total and in the part attributable to positioning, and it establishes nothing else whatsoever. The grid below is the finished sheet.

The finished map: three rows filled, four rows visibly empty. THE QUESTION WHAT THE MAP PUTS IN THE CELL STATED INPUTS. Base Rs 5,000 crore at the valuation date. Portfolio MODIFIED duration 5.20. Benchmark 4.80. Difference 0.40. The move, a rise of 100 basis points, PARALLEL. What the stated move costs in total Rs 260 crore The part that came with the benchmark Rs 240 crore The part attributable to positioning Rs 20 crore What a move of another shape costs no scenario of that shape exists here What is held, split by industry no split by industry exists here Who the borrowers are, and the largest no list of borrowers exists here Money arrived, money left, and when no record of money moving exists here Three rows carry a figure with a label. Four carry a reason where the figure would have gone. Every filled cell is arithmetic on the figures printed in the band at the top of the sheet.
On the portfolio this material records, three cells of the map fill and four come back empty with their reasons written inside them.

Count the proportion on that sheet. Three cells answer something and four say why they cannot. The four blanks are what a reader would otherwise have quietly assumed somebody checked. A reader who expected the balance to run the other way has learned the more useful of the two lessons available here.

A filled cell and an empty cell are the same kind of result. A FILLED CELL THE ACTIVE PART Rs 20 crore under a rise of 100 basis points, PARALLEL in shape AN EMPTY CELL WHAT ANOTHER SHAPE COSTS no scenario of that shape exists here the reason sits where a figure would Both are outputs of step seven. Only one of them carries a number.
A filled cell carries a figure and its label, an empty cell holds the reason no figure could go there, and both are outputs of the same step.
Risk Management Program Bootcamp — Fin Maverick Hedging a Real Exposure — free micro-course from Fin Maverick

What rule runs through all eight of the steps?

Everything above rests on one rule, and it is worth stating separately because it is the rule people abandon under time pressure. Every step that touches a cell puts into it either a figure carrying a label or a reason carrying a border. A step never puts in a bare number and never leaves a gap. Step eight is the exception that proves the shape of it: step eight touches no cell, and what it produces is the reading of the cells the other seven filled or left.

A bare number is the fault this whole sequence exists to prevent. On the sheet above, two rupee figures sit thirteen times apart and look completely alike inside a cell. Strip the labels and nobody downstream can tell which of the two questions a figure was answering, and the sheet acquires an error that no arithmetic check will ever catch.

A gap is the worse of the two faults. The next reader fills it. An empty cell with a reason in it is closed: it says what is missing and what would have to appear for the row to be filled. An empty cell with nothing in it is an invitation, and somebody eventually accepts.

A cell without its label is two different answers at once. Rs 20 crore label: none written READ AS THE WHOLE COST of the same PARALLEL rise the sheet understates by Rs 240 crore READ AS THE ACTIVE PART of the same PARALLEL rise the sheet is right, and unreadably so The two readings sit thirteen times apart, and only the label separates them.
An unlabelled rupee figure can be read as the whole cost or as the active part, and on this portfolio those two readings sit thirteen times apart.
Try it out

A finished map carries one cell holding the figure Rs 20 crore and nothing else. The move behind it was a PARALLEL rise of 100 basis points. Where does that cell fail?

The error that gets made, and what it costs

The map goes out with its empty cells tidied away. Nobody set out to mislead. A grid with holes in it invites questions the sender cannot answer, the house template has no way of representing a row that cannot be measured, and finished documents are the ones that get read. So the four blanks are either deleted or filled with something plausible, and the sheet leaves the desk looking complete.

Deleting them is the quieter damage. Every figure on the tidied sheet is still correct, and the sheet now reads as a complete exposure picture in which the only exposure that exists is to a parallel move. Every later reader takes the other four as checked and found to be nothing.

Filling them is worse. A plausible figure sitting in a grid cell acquires a source it never had by the second time it is quoted, and by the fourth nobody can name where it came from. The repair is one line: an empty cell is an output, so give it a reason and a border and let it be seen.

The same map twice. No figure was altered between them. AS THE MAP WAS BUILT Total cost of the stated moveRs 260 crore Benchmark partRs 240 crore Active partRs 20 crore Another curve shapeno scenario here Split by industryno split here The borrowersno list here Money in and money outno record here AS THE MAP WAS SENT Total cost of the stated moveRs 260 crore Benchmark partRs 240 crore Active partRs 20 crore four rows removed and no trace of the questions Every figure in the version on the right is still correct. What changed is what the sheet claims. The tidied sheet reads as a complete exposure picture, and no reader of it can tell that it is not.
A map with its empty rows deleted reads as a complete exposure picture, and every figure in it is still correct.
Every cell carries a label, never a bare number. See what the exposures hold.

Who builds a map like this, and when does it get built?

The map is not an exercise. The map is the sheet somebody produces before a conversation, and it fixes which questions the conversation is allowed to treat as answered.

A lender's treasury desk builds it because the rate exposure sitting on the balance sheet has to be described to somebody who did not put it there. The description has to survive a challenge, and the fastest way to lose a challenge is to have quoted a figure that turns out to have been the chosen part when everybody read it as the whole. Step six and its labels exist for exactly that conversation.

An analyst covering a debt scheme builds it from the outside, as a way of reading somebody else's pack. Read that way, the empty rows are the interesting ones. The blanks say which questions the pack has not addressed, and that is often more informative than the figures it does carry. An analyst who can name the four missing rows can ask four specific questions instead of a vague one.

A household does a small version of it every time somebody asks how safe the savings are. The balance is knowable. Whether the money is locked up for three years is knowable. Whether the household could handle two months without income is knowable only if somebody has written down what two months of outgoings comes to, and most households have not. The discipline is identical at every scale: the question gets named, it gets answered where an answer exists, and where none does, the reason is written down rather than passed over.

One thing none of the three does with the sheet is decide anything from it alone. The map prices what exists. Deciding what to do about it is a separate conversation that starts where the map stops, uses inputs the map does not carry, and is covered separately.

Try it out

The finished map shows the portfolio positioned longer than its benchmark, with an active part worth Rs 20 crore under the stated PARALLEL rise. Does the map say anything about whether that positioning should be kept?

Why is there no control to move here?

The single relationship a slider would show, the size of a stated PARALLEL move against what it costs, already sits under a control covered separately. A second control carrying the same idea would be decoration.

The subject here is the map itself, and the map is static. The map teaches an order and a recording habit, and neither of those becomes clearer when a number moves. The interaction is of a different kind: nine questions, several of which call for a prediction before the sheet reveals the figure. The gap between the prediction and what the split actually shows is what is worth carrying away.

India

Eight steps, and the rule-set item each one leans on

StepThe item it leans on, unwritten hereConfirm at
Step oneThe valuation norm a regulated holder must carry a debt portfolio at, which decides what the base may be struck atReserve Bank of India, rbi.org.in
Step twoThe benchmark a regulated pooled vehicle must state, and the manner in which it must be disclosedSecurities and Exchange Board of India (SEBI), sebi.gov.in
Step threeThe rate sensitivity figure a regulated pooled vehicle must disclose, and how oftenSEBI, sebi.gov.in
Step fourThe stress scenarios a regulated balance sheet must run against its rate exposureReserve Bank of India, rbi.org.in
Step fiveThe capital treatment that applies to interest rate risk in a regulated holder's booksReserve Bank of India, rbi.org.in
Step sixHow a performance difference against a benchmark must be computed and presented for a regulatory returnSEBI, sebi.gov.in
Step sevenThe exposure and holding limits placed on a regulated holder of debt, and which categories of holder may hold which debt instruments and in what amountReserve Bank of India, rbi.org.in, and SEBI, sebi.gov.in
Step eightWhat a holder must be told about the composition of a debt portfolio, and how oftenSEBI, sebi.gov.in

Each row is a routing, and all eight are revised over time. The current text is best confirmed at the address beside the step before the map is relied on.

The construction of a MODIFIED duration from a schedule of payments is covered separately, and the figure arrives here as an input to step three. Convexity, and the correction it makes to the estimate step five uses, is covered separately too. A curve move of another shape, a split of the holdings by industry, a list of borrowers and a record of money arriving and leaving each need an input this portfolio has never carried, so step seven draws all four of those rows empty. THE LADDER, THE BARBELL and THE BULLET SHAPE each name a holding pattern, and the map cannot produce one of them because it has no holding list to read a shape from. How far a portfolio's returns wander from a benchmark's, and what drives that, is covered separately. And because nothing on this sheet could support the answer, no step above says whether a position should be held, widened or closed.
Financial Analyst Program Bootcamp — Fin Maverick

Where each step points when a rule is needed

Kept byWhich steps point thereWhat is published thereSiteRead on
Reserve Bank of IndiaSteps one, four, five and sevenThe valuation norm behind a base, the stress scenarios a regulated balance sheet runs against rate exposure, the capital carried against interest rate risk, and the exposure and holding limits placed on a regulated holder of debtrbi.org.in28 August 2026
SEBISteps two, three, six, seven and eightThe benchmark a regulated pooled vehicle states, the rate sensitivity it discloses and how often, how a difference against a benchmark is computed for a regulatory return, which categories of holder may hold which instruments, and what a holder is told about compositionsebi.gov.in28 August 2026
Settlement and reporting infrastructure for government securitiesNone of the eight, which is the pointTraded curves, named here only as the class of body that publishes them, with no level of any kind taken from any of themnamed as a class28 August 2026
Bank for International SettlementsNone of the eightThe origin of a rate risk standard, cited as an origin and never as a rule in force in this jurisdictionbis.org28 August 2026
Repository of working papersNone of the eightThe route taken before any academic name is usedideas.repec.org28 August 2026

Where each number on the map came from

CellOrigin
The base, Rs 5,000 crore of market valueWritten for teaching, and carried unchanged across this sequence
The portfolio's MODIFIED duration, 5.20Written for teaching
The benchmark's MODIFIED duration, 4.80Written for teaching
The move, a rise of 100 basis points, PARALLEL in shapeDeclared on the map at step four. Nothing observed it and nothing forecast it
WHOLE EXPOSURE, BENCHMARK PART and ACTIVE PARTArithmetic on the four rows above, re-run at the step that produces each
The four cells drawn emptyNo number, from any source, for any reason

The portfolio, the benchmark and every figure attached to either are invented.
Educational material. Not advice on any investment, tax, budget or market position.

← PreviousNext →
Fin Maverick Micro CoursesExplore Micro Courses
Fin Maverick BootcampsExplore Bootcamps
Fin Maverick

Finance education that ends in a job, not a certificate that gathers dust. Built for young India.

LEARN
CalculatorsFrameworksComparisonsCareersShowdown
RESOURCES
All CoursesMicro CoursesBootcampsInternships
COMPANY
AboutJob openingPartnership
LEGAL
Privacy PolicyTerms & ConditionsContent LicenseReturn & Refund Policy
© 2026 FIN MAVERICK / BUILT FOR INDIA.DO FINANCE, DO NOT JUST READ ABOUT IT.